2  PLANNING

2.3  MOUNTING OPTIONS

MOUNTING 
OPTIONS

REQUIREMENTS

All

 

Ä

The loads in the table are related to the mechanical stability of the solar modules. The mechanical stability of the 
mounting system including clamps has to be evaluated by the system supplier. The listed test load values have 
been determined with the following clamp parameters: clamp width = 40 mm and clamp depth = 10 mm.

 

Ä

The system installer is responsible for the determination of location-specific load requirements.

 

Ä

Modules bend under loads. Therefore, sharp objects (e.g. screws, ballast stones, rail ends, rails with burrs or sharp 
corners) must not be placed near the module backside so as not to touch the laminate under load.

 

Ä

Ensure that the junction boxes do not touch the mounting structure (e.g. shorts rails, ballast, etc.) or the roof top 
under load. Clamps or insertion profiles etc. must not touch the glass (even under load).

 

Ä

Unbalanced loads (e.g. snow overhangs, snowdrifts) which result in locally significantly increased loads must be 
removed or avoided by technical measures.

CL1a, CL3, 
mCL3, 
CL2a, FB1, 
FB2, mFB2

 

Ä

Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between the module 
and substructure).

CL1b

 

Ä

Using of short mounting rails are permissible, if they overlap under the module less than 285 mm. Minimum clear-
ance between frame bottom edge and roof top must be ≥ 30 mm.

CL1a, CL2a, 
FB1

 

Ä

Ensure, that the connection cables of the junction box do not run between laminate and mounting rails.

CL1b, CL2b, 
CL3, mCL3, 
FB2, mFB2

 

Ä

A minimum support depth of 15 mm is required on the back side of the module.

CL5

 

Ä

The minimum required support depth on the module backside is 10 mm on long frame side and 15 mm on short 
frame side.

IP1

 

Ä

Ensure minimum support depth of 15 mm on the backside and 10 mm on the front side of the module.

TC1

 

Ä

Ensure minimum support depth of 12 mm on the backside and 10 mm on the front side of the module.

FB1, FB2, 
TB1a, TB2a, 
TB1b, TB2b, 
mFB2

 

Ä

Use M8 corrosion-proof screws and washers (diameter ≥ 15.8 mm) for mounting slots (Detail A, Fig.1) and M6 cor-
rosion-proof screws and washers or bobtails for tracker slots (diameter ≥ 13 mm; Detail B, Fig. 1). Mounting screws 
and washers should have the same material properties.

TB2a, TB2b

 

Ä

Mounting rails need to extend beyond the middle of mounting holes by at least 17 mm.

mCL3, mFB2

 

Ä

Mounting rails need to extend beyond the middle of clamps or middle of mounting holes by at least 20 mm. Clamps 
must not extend beyond the mounting rails.

2  PLANNING

2.3  MOUNTING OPTIONS

Specifications

MODULE TYPE

MOUNTING
OPTION

POSITION OF CLAMPS* 
[MM]

TEST LOAD 
PUSH / PULL**  [PA] 

DESIGN LOAD 
PUSH / PULL**  [PA] 

SAFETY 
FACTOR

Q.PEAK DUO XL-G10.2
Q.PEAK DUO XL-G10.c

CL1a 

11.8 - 21.7 (300 - 550)

5400 / 2400

3600 / 1600

1.5

CL1b

3000 / 2400

2000 / 1600

CL3 / mCL3

3600 / 3000

2400 / 2000

CL5

short side: 0.79 - 3.93 
(20 - 100)
long side: 15.8 - 21.6 
(400 - 550)

3000 / 2400

2000 / 1600

FB1

17.9 (454)

5400 / 3000

3600 / 2000

FB2

3600 / 3000

2400 / 2000

mFB2

3400 / 3000

2260 / 2000

IP1

-

3600 / 3000

2400 / 2000

TB1a

35.8 (908)

2500 / 2400

1660 / 1600

TB1b

28.1 (713)

3600 / 3000

2400 / 2000

TB2a

outer side: 35.8 (908) 
inner  side:  35.8 / 28.1 / 17.9 
(908 / 713 / 454)

2700 / 2400

1800 / 1600

TB2b

outer side: 28.1 (713) 
inner  side:  28.1 / 17.9 
(713 / 454)

3600 / 3000

2400 / 2000

 

Ä

The below mounting options are only possible under certain conditions.

MODULE TYPE

MOUNTING 
OPTION

POSITION OF CLAMPS* 
[MM]

TEST LOAD 
PUSH / PULL***  [PA] 

DESIGN LOAD 
PUSH / PULL***  [PA] 

SAFETY 
FACTOR

Q.PEAK DUO XL-G10.2
Q.PEAK DUO XL-G10.c

TC1

35.8 - 37.7 (908 - 958)

2400 / 2200

1600 / 1460

1.5

CL1a

0.79 - 21.7 (20 - 550)

2400 / 2000

1600 / 1330

CL2a (with 
rails)

0.79 - 3.93 (20 - 100)****

2400 / 1600

1600 / 1060

CL2b (with-
out rails)

0.79 - 3.93 (20 - 100)

1600 / 1600

1060 / 1060

*

** 

***

****

Distance between outer edge of module and middle of the clamp (see table „2.3 Mounting Options“ on page 7); consider further details below. 

Loads according to IEC 61215-2:2016 and UL 61730. 

Test procedure according to IEC 61215-2:2016 and UL 61730. Loads for these mounting options do not fulfill the requirements of the standards.

Rails must not be under the junction box.

Summary of Contents for Q.PEAK DUO XL-G10.c

Page 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G10 2 G10 c solar module series...

Page 2: ...are responsible for com pliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the installation operation and mai...

Page 3: ...ble documents This installation manual is only valid in combination with the following technical information DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INCORRECT US...

Page 4: ...tress free expansion and contraction due to tem perature fluctuations Ensurethatnoadditionalforcesareappliedthroughthemounting system into the module except for the wind and snow loads Additional forc...

Page 5: ...YSTEM INSTALLATION ON MOUNTING POINTS INSTALLATION WITH INSERTION PROFILES NOT PERMITTED TRACKER INSTALLATION ON MOUNTING POINTS TB1a 35 8 908 TB2a 35 8 908 35 8 28 1 17 9 908 713 454 TB1b 28 1 713 TB...

Page 6: ...the module TC1 Ensure minimum support depth of 12mm on the backside and 10mm on the front side of the module FB1 FB2 TB1a TB2a TB1b TB2b mFB2 Use M8 corrosion proof screws and washers diameter 15 8mm...

Page 7: ...ng factor of 125 percent 80 percent derating which might be applicable Please follow the valid national guidelines for the installation of electrical systems refer to section 690 8 of the NEC for an a...

Page 8: ...out the installation alone Only install undamaged modules and components Do not modify the module e g do not drill any additional holes 3 INSTALLATION 3 2 PREPARATION OF INSTALLATION confirmation let...

Page 9: ...Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the time intervals specified by the inverter manufacturer after switching off the inverter Make sure th...

Page 10: ...ick click DANGER Risk of fatal injury due to electric shock Ensure that all electrical components are in a proper dry and safe condition SOLAR 4 ELECTRICAL CONNECTION 4 3 CONNECTION OF MODULES DANGER...

Page 11: ...and backing nut Care should be taken to avoid the use of grounding hardware of dissimilar metals which may lead to corrosion Option B Integrated grounding methods The Q CELLS modules can be bonded wi...

Page 12: ...ing to the state of the art and taking into account all relevant safety issues and general product properties e g but not restricted to electrical safety mechanical stability load limits depending on...

Page 13: ...ithout notice Q CELLS Installation manual solar modules Q PEAK DUO XL G10 2_G10 c_2022 01_Rev02_NA 24 INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q PEAK DUO XL G10 2 G10 c Q CELLS Free the substru...

Reviews: