Installation Guide / ComT 2.0: 5°, 10° and 15°
34
Code-Compliant Planning and Installation Guide V1.0 - Complying with AS/NZS1170.2-2011 AMDT 2-2016
19
General Notes
Note 1. This engineering document was designed to cater for most common installation scenarios
however, it does not cater for all of them. Contact Clenergy if you are unable to comply with any of
the installation specifications listed on this document.
Importance
level
Structure type examples
Annual probability of
exceedance for a design
working life of 25 years
1
Fences, utility posts, isolated minor facilities, minor
temporary facilities and small ground mount
installations (up to 20 kw).
1/100 - 100 years
2
Residential shed or garage, small isolated warehouses,
isolated farm sheds, residential carports, medium
ground mount installations (up to 100 kw) and one or
double storey dwelling.
1/200 – 200 years
3
Buildings and facilities where a large group of people
can congregate in one area, commercial buildings,
schools, aged cares, large office buildings, large
commercial warehouses, large ground mount
installations, multi-storey dwelling and churches.
1/500 – 500 years
4
Buildings and facilities designated as essential facilities
such as medical emergency or surgery facilities,
universities, police stations, emergency shelters, High
rise buildings (more than 40 storeys) airports and
government buildings.
1/1000 – 1000 years
Note 2. Maximum roof pitch of 10°.
Note 3. Panels to be installed only as per figure 1.
Figure 1. Panel configuration
- Certification -