PSG Dover WILDEN Accu-Flo A2 Engineering, Operation & Maintenance Download Page 13

 

 

WIL-10060-E-03

 

Wilden

®

 

13 

Suggested Installation, Operation, Maintenance and Troubleshooting 

 

All Wilden pumps are manufactured with a variety of materials for the air 
distribution system, liquid path and elastomers. This variety is offered to 

satisfy the temperature, chemical compatibility, abrasion and flex life 
requirements for most applications. Consult manual for available materials 
and temperature limitations for this pump model. 
For Accu-

Flo™ models only, all wiring used to ope

rate the pump should be 

placed and connected according to all applicable electrical codes. It is 
important that the wiring be of adequate gauge to carry the current required 

to operate the pump. In addition, it is necessary that the electrical power 
supply be large enough to supply the current required to operate the pump. 
Wiring should be above ground level if possible (in case of fluid spill or 
leakage), and all wiring and connections which could become wet or damp 
should be made watertight. 
The suction pipe used for installation should be sized equal to, or greater 

than, the pump liquid inlet connection. This will minimize pump cavitation  
and potential blockages of the pump inlet. The discharge piping should also 
be sized equal to, or greater than, the pump liquid discharge connection. If 
the pump is to be used in a self-priming application, be sure that all 

connections are airtight and that the suction lift is within the pump’s ability. 

(Consult manual for suction lift information.)  

NOTE:

 Materials of construction and elastomer materials have an 

effect on suction lift parameters

Installation

 

Months of careful planning, study and selection efforts can result in 
unsatisfactory pump performance if installation details are left to chance. 

Premature failure and long term dissatisfaction can be avoided if reasonable 
care is exercised throughout the installation process.

 

Location

 

Noise, safety, and other logistical factors usually dictate that "utility" 
equipment be situated away from the production floor. Multiple installations 

with conflicting requirements can result in congested utility areas, leaving 
few choices for siting additional pumps. 
Within the framework of these and other existing conditions, every pump 
should be located in such a way that four key factors are balanced against 
each other to maximum advantage:

 

 

Access: 

First of all, the location should be accessible. If it is easy to 

reach the pump, maintenance personnel will have an easier time 
carrying out routine inspections and adjustments. Should major 
repairs become necessary, ease of access can play a key role in 

speeding the repair process and reducing total downtime.

 

 

Air Supply: 

Every pump location should have an air line large 

enough to supply the volume of air necessary to achieve the desired 

pumping rate. (Consult manual for performance information.) The 
use of an air filter before the pump will ensure that the majority of 
pipeline contaminants will be

 

eliminated. For best results, the pump 

should use an air filter, regulator system. 
Sound levels are reduced below OSHA specifications using the 
standard Wilden muffler.

 

 

Elevation: 

Selecting a site that is well within the pump’s dynamic lift 

capability will assure that a loss-of-prime condition will be avoided. In 
addition, pump efficiency can be adversely effected if proper attention 

is not given to site location. 

 

Piping: 

Final determination of the pump site should not be 

made until the piping problems of each possible location have 
been evaluated. The impact of current and future installations 
should be considered ahead of time to make sure that 

inadvertent restrictions are not created for any remaining sites. 

The best choice possible will be a site involving the shortest and 
straightest hook-up of suction and discharge piping. Unnecessary 
elbows, bends, and fittings should be avoided. Pipe sizes should 
be selected so as to keep friction losses within practical limits. All 
piping should be supported independently of the pump to avoid 
damage. In addition, the piping should be aligned so as to avoid 

placing stress on the pump fittings. 
Flexible hose can be installed to aid absorbing the forces created 
by the natural reciprocating action of the pump. If the pump is to be 
bolted down to a solid location, a mounting pad placed between 
the pump and the foundation will assist in minimizing pump 
vibration. Flexible connections between the pump and rigid piping 

will also assist in minimizing pump vibration. If quick-closing valves 
are installed at any point in the discharge system, or if pulsation 
within a system becomes a problem, a Wilden Equalizer

®

 surge 

dampener should be installed to protect the pump, piping and 
gauges from surges and water hammer. Installation of a tee at the 
discharge of the pump will allow the addition of an Equalizer to the 

system at a later date without requiring piping modifi- cations. 
Installation of inlet and discharge isolation valves are also 
recommended to make service and repair easier. 
Pumps in service with a positive suction head are most efficient 
when pressure is limited to 0.4-0.7 bar (7-10 psig). Premature 
diaphragm failure may occur if positive suction exceeds these 

recommended pressures. 

 

A STRAINER SHOULD BE USED ON THE SUCTION LINE OF 
THE SYSTEM IF THERE IS A POSSIBILITY THAT SOLIDS 
ENTERING THE PUMP MA

Y EXCEED THE PUMP’S SOLIDS 

HANDLING CAPABILITIES. 
PLEASE READ AND FOLLOW ALL CAUTIONS NOTED IN  

THIS MANUAL. 
Pump should be thoroughly flushed before installing into 
process line. 
Blow out air line for 10 to 20 seconds before attaching pump to 
clear all pipe line debris

 

 

 

Section 6 

Summary of Contents for WILDEN Accu-Flo A2

Page 1: ...EOM ENGINEERING OPERATION MAINTENANCE A2 Accu Flo Clamped Metal Pump WIL 10060 E 03 Where InnovationFlows...

Page 2: ...E Fitted T series Center Section 10 A2P Metal Rubber Fitted P series Center Section 11 A2P Metal PTFE Fitted P series Center Section 11 70 30 Operating Conditions 12 A2T Metal Rubber Fitted T series C...

Page 3: ...ifornia LLC Wil Flex is a trademark of PSG California LLC Saniflex is a trademark of PSG California LLC All trademarks names logos and service marks collectively trademarks in this document are regist...

Page 4: ...occurs fire or explosion could result Pump valves and containers must be properly grounded when handling flammable fluids and whenever discharge of static electricity is a hazard CAUTION Do not excee...

Page 5: ...onnection 0618 Ultrapure PFA coated hardware w Wil Gard II 110V Male Connections 0622 Ultrapure w Male Connections 0623 Ultrapure Adapter Block No Muffler Male Connections 0624 Ultrapure w Wil Gard II...

Page 6: ...quid chamber see shaded area FIGURE 2 When the solenoid valve is deenergized the air valve redirects pressurized air to the back side of diaphragm B The pressurized air forces diaphragm B away from th...

Page 7: ...254 10 0 E 279 11 0 F 28 1 1 G 97 3 8 H 76 3 0 J 191 7 5 K 211 8 3 L 173 6 8 M 107 4 2 N 127 5 0 P 8 0 3 R 33 1 3 DIMENSIONS ITEM METRIC mm STANDARD inch A 267 10 5 B 36 1 4 C 130 5 1 D 152 6 0 E 254...

Page 8: ...279 11 0 F 28 1 1 G 53 2 1 H 91 3 6 J 124 4 9 K 213 8 4 L 76 3 0 M 142 5 6 N 229 9 0 P 211 8 3 R 173 6 8 S 107 4 2 T 127 5 0 U 33 1 3 V 8 0 3 DIMENSIONS ITEM METRIC mm STANDARD inch A 267 10 5 B 36 1...

Page 9: ...F 295 11 6 G 41 1 6 H 97 3 8 J 76 3 0 K 191 7 5 L 211 8 3 M 173 6 8 N 107 4 2 P 127 5 0 R 8 0 3 S 43 1 7 DIMENSIONS ITEM METRIC mm STANDARD inch A 267 10 5 B 36 1 4 C 124 4 9 D 254 10 0 E 267 10 5 F 2...

Page 10: ...mps should be specified so that daily operation parameters will fall in the center of the pump s performance curve A2T METAL PTFE FITTED Height 279 mm 11 0 Width 267 mm 10 5 Depth 191 mm 7 5 Est ShipW...

Page 11: ...ce pumps should be specified so that daily operation parameters will fall in the center of the pump s performance curve A2P METAL PTFE FITTED Height 279 mm 11 0 Width 267 mm 10 5 Depth 229 mm 9 0 Est...

Page 12: ...essure condition This curve can be applied to different pressure conditions to estimate the change in flow due to stroke rate A2P METAL ACCU FLO These curves demonstrate the flow created when the stro...

Page 13: ...line large enough to supply the volume of air necessary to achieve the desired pumping rate Consult manual for performance information The use of an air filter before the pump will ensure that the maj...

Page 14: ...y pressure is provided For the A2T the minimum supply pressure for reliable operation is 2 7 bar 40 psig The solenoid operated pump is permanently lubricated during assembly and requires no additional...

Page 15: ...atch the thickness of the material being pumped 4 Check for sticking ball check valves If the material being pumped is not compatible with the pump elastomers swelling may occur Replace ball check val...

Page 16: ...A2 is an air operated double diaphragm pump with wetted parts of aluminum stainless steel and Alloy C The single piece center section consisting of center block and air chambers is molded of polyprop...

Page 17: ...arge valve balls seats and O rings from the discharge manifold and inspect for nicks gouges chemical attack or abrasive wear Replace worn parts with genuine Wilden parts for reliable performance PTFE...

Page 18: ...hragm inner piston and disc spring separate from the shaft which remains connected to the opposite side diaphragm assembly PTFE fitted pumps come standard with back up diaphragms not shown Step 9 To r...

Page 19: ...one liquid chamber on its side and align center section with chamber using alignment marks made during disassembly Push down on diaphragm assembly until diaphragm is inverted Place opposite liquid ch...

Page 20: ...WIL 10060 E 03 Wilden 20 EXPLODED VIEW AND PARTS LISTING A2T METAL EXPLODED VIEW Section 8...

Page 21: ...02 3510 99 21 Back up Diaphragm 2 N R N R N R N R N R 02 1060 51 02 1060 51 02 1060 51 02 1060 51 02 1060 51 22 Diaphragm 2 02 1010 55 02 1010 55 02 1010 55 02 1010 55 02 1010 55 23 Valve Balls 4 02 1...

Page 22: ...WIL 10060 E 03 Wilden 22 A2P METAL EXPLODED VIEW...

Page 23: ...02 3701 01 02 3701 01 02 3701 01 02 3701 01 02 3701 01 02 3751 01 02 3751 01 02 3751 01 02 3751 01 02 3751 01 22 Pistons Outer 2 02 4550 01 02 4550 01 02 4550 03 02 4550 04 02 4550 03 02 4550 01 02 45...

Page 24: ...A N A 02 1120 04 Electrical Information NEMA 41 UL CSA Part Number Voltage 10 Power W 10 Current A Resistivity DC AC DC AC 60 Hz 50 Hz Inrush Holding 00 2110 99 150 24 48 44 4 8 20 20 20 121 00 2110...

Page 25: ...WIL 10060 E 03 Wilden Notes...

Page 26: ...WIL 10060 E 03 Wilden Notes...

Page 27: ...WIL 10060 E 03 Wilden Notes...

Page 28: ...Terrace CA 92313 5651 USA P 1 909 422 1730 F 1 909 783 3440 psgdover com Where Innovation Flows PSG reserves the right to modifythe information and illustrations contained in this document without pr...

Reviews: