
ProTec Polymer Processing GmbH
Foerdergeraet_FG201-FG206_BA_1v0_2018_en
62
8.4.5 Replacing check valve
1.
Open locks.
2.
Disconnect plug connections.
3.
Remove blower attachment.
4.
Remove filter insert.
5.
Loosen screws (1) on the conveying goods container.
6.
Remove the check valve (3) and holder plate (2) from the inside.
7.
Apply Loctite 242 on the screws threads.
8.
Insert the new check valve with holder plate and screw hand-tight together.
9.
Replace the filter insert.
10.
Set on the blowerattachment.
11.
Fasten locks.
12.
Connect plug connectors.