
ProTec Polymer Processing GmbH
Foerdergeraet_FG201-FG206_BA_1v0_2018_en
29
Earthing the conveyor line
2
Hose clamp
4
Conveying tube
3.
Connect aluminium or VA piping using earth clamps with an earth conductor!
The earthing must be done via earthed conveyor hose to (earthed) conveyor tube or
suction hose (see Earthing the conveyor line illustration).
Picture of connection on the conveying tube:
2
Hose clamp
3
Suction hose
4
Conveying tube