
ProTec Polymer Processing GmbH
Foerdergeraet_FG201-FG206_BA_1v0_2018_en
59
8.3.8 Replacing the compressed air valve on the cleaning valve
1.
Remove the cable plug (17).
2.
Pull off the compressed air hose (19).
3.
Loosen the union nut (5) and remove the compressed air valve (36a).
4.
Unscrew connection (5), nipple (19) and locking screw (18) and fasten on the new
compressed air valve.
5.
Tightly screw on the compressed air valve (36a) with the nut (5).
6.
Stick the hose in the nipple (19).
7.
Stick on the cable plug (17) and screw tightly.
After maintenance
1.
Replace hood (21) and screw down tightly.
2.
Set on the blower attachment.
3.
Fasten locks.
4.
Reconnect plug connectors.
5.
Put on compressed air coupling.
6.
Connect device to mains power.