
7. Use a 1/2" socket to remove the two Drive Components assembly carriage bolts (2x)
and nuts (2x). Remove the rear (lower) bolt first and then slide the Drive Components
assembly downward to create room to remove the forward (upper) carriage bolt.
Remove the Drive Components assembly. Retain part(s) and/or fastener(s) for install-
ation.
Installation Instructions
1. If the Drive Components assembly is disassembled, reassemble as follows:
a. Install the Generator/Brake assembly onto the Step-up Pulley/Tensioner
assembly and secure using the two 1/2" Carriage bolts and nuts.
b. Tighten the carriage bolts just enough to keep the carriage bolt heads inserted
into the mounting slot but do not fully tighten.
c. Walk the second stage drive belt onto the Generator/Brake assembly pulley and
the larger second stage Step-up Pulley/Tensioner assembly pulley. Tighten the
second stage tensioner just enough to hold the tensioner hardware and belt in
position. The belt will be properly tensioned after the Drive Components
assembly is installed.
2. Position the Drive Components assembly onto the Drive Tower Gusset.
Contact Precor Customer Support at [email protected] or 800.786.8404 with
any questions.
Page 131
6 Replacement Procedures
Generator/Brake Assembly Replacement