ConsoliDator Multi-Channel Controller
Instruction Manual
21
SETUP AND PROGRAMMING
There is
no need to recalibrate
the instrument when first
received from the factory.
The device is
factory calibrated
prior to shipment, for all
input types. The calibration equipment is certified to NIST
standards.
Overview
Setup and programming are done
through the front buttons or ConsoliDator
Monitor Software. After power and signal
connections have been completed and
verified, apply power to the instrument.
Inputs, outputs, and relays are
configured individually. It is
recommended that all inputs be
configured before outputs and relays are
programmed.
Shown to the right is a typical screen that
appears upon first power-up. Actual
screens will vary with the amount of
inputs initially detected.
For information on button functions, see
NAVIGATING AND EDITING
(page 20.)
To load software and program from a
PC, please familiarize yourself with the
ConsoliDator Monitor Software
(page 51) before you continue with
device setup.
SETUP
AUTO
ACK
NEXT
Ch1
Ch2
Ch3
Ch4
Ch 1:
Ch 2:
Ch 3:
Ch 4:
13.000
14.000
15.000
mA
mA
mA
mA
mA
12.000
Press
SETUP
key to begin.