background image

24

MECHANICAL INSTALLATION

The following precautions should be strictly observed while installing the indicator:
 
1.   The place of installation should be free of corrosive / combustible gases and electrically conductive pollution.

2.   Ensure that the place of installation is not subject to rapid ambient changes that can cause condensation. Also the Ambient 

Temperature and Relative Humidity surrounding the indicator should not exceed the maximum specified for the proper 

operation of the indicator.

3.   The place of installation should be adequately protected against excessive electrostatic or electromagnetic interference.

4.   The indicator should not be subject to direct vibration or shock.

5.   The indicator should not be exposed to dust, salt air, direct sunlight or radiant heat. 

OUTER DIMENSIONS

The Figure 10.1 shows the outer dimensions of the indicator. 

Figure 10.1

Side View

100 mm

(4 in)

0.8 mm

Front View

PANEL CUTOUT AND RECOMMENDED MINIMUM SPACING

The Figure 10.2 shows the panel cutout requirements for a single indicator and also the minimum spacing recommended if 

several indicators are required to be mounted on a single panel. 

PANEL MOUNTING

Follow the steps below for mounting the indicator on panel:

   

1. Prepare a square cutout to the size shown in

 

Figure 10.2.

   

2. Remove the Panel Mounting Clamp from the indicator Enclosure.

   

3. Insert the rear of the indicator housing through the panel cutout from the front of the mounting panel.

    

4.

Hold the indicator gently against the mounting panel such that it positions squarely against the panel wall (see Figure 

10.3). Apply pressure only on the bezel and not on the front label.

5.

   

Fix the Mounting Clamps (one after the other) such that the metallic projection fits in the square hole provided on the top 

and bottom sides of the enclosure. Tighten the clamp screw until the clamps firmly secures against the panel wall.  

User Manual

neuro 100EX

Section 10

PPI

neuro 100 EX

96 mm

(3.78 in)

96 mm

(3.78 in)

ACK

OPR

AL3

AL4

AL1

AL2

Summary of Contents for neuro 100EX

Page 1: ...neuro 100EX User Manual Enhanced Universal Process Indicator...

Page 2: ...ON 3 3 SET UPMODEACCESSAND OPERATION 5 4 ALARM PARAMETERS 7 5 RETRANSMISSION PARAMETERS 9 6 INPUT CONFIGURATION 10 7 SUPERVISORYPARAMETERS 14 8 USER LINEARISATION PARAMETERS 16 9 HARDWAREASSEMBLY CONF...

Page 3: ...out is a 5 digit 7 segment bright green LED display and usually displays Process Value Units In case of any activeAlarm s the Lower Readout flashesAlarm Status information In Set up Mode the Lower Rea...

Page 4: ...to store the set parameter value and to scroll to the next parameter on the PAGE Press to enter or exit set up mode Press to increase the parameter value Pressing once increases the value by one count...

Page 5: ...h the last operator parameter indicator Alternatively use PAGE key to return to MAIN Display Mode Note The Operator Page can also be accessed through PAGE 0 The pages and parameters are explained in n...

Page 6: ...ues and start afresh monitoring the PV for new Min Max values No Yes Default No RESET PASSWORD For resetting the Min Max values set the reset command to Yes and then enter the correct password 0 to 25...

Page 7: ...red PAGE NUMBER is invalid contains no parameter list or any associated function the reverts to the MAIN Display Mode indicator 4 Press and release the ENTER key until the prompt for the required para...

Page 8: ...ster Lock however does not lock the operator parameters This feature allows protecting the rather less frequently used parameters against any inadvertent changes while making the frequently used opera...

Page 9: ...ARM HYSTERISIS This parameter value sets a differential dead band between the ON and OFF Alarm states Keep it large enough to avoid frequent switching of theAlarm relay No Yes Default No Settings Defa...

Page 10: ...tivation does not affect the Relay status The Relay status can only be regained by pressing Acknowledge key provided the Alarm has de activated ALARM LOGIC Select Normal if Alarm is to activate an Aud...

Page 11: ...Min to Max Range Specified for the Selected Input Type Set the Lower PV Limit that shall correspond to the minimum recorder output signal level 0 mA 4 mA 0 V RECORDER LOW Default 0 to 20 mA 0 to 20 m...

Page 12: ...ue indication resolution decimal point All the resolution based parameters hysteresis alarm setpoints etc then follow this resolution setting RESOLUTION Select Temperature units in C or F for Thermoco...

Page 13: ...Units C F Kelvin Engineering Units Percentage Pascals Mpascals Kpascals Bar Milli bar PSI kg sq cm mm water gauge Inches water gauge mm mercury Torr Litres per hour Litres per minute Relative Humidity...

Page 14: ...illi amps Milli Volts Ohms Parts per million Revolutions per pinute Milli seconds Seconds Minutes Hours PH PH Miles per hour Milli grams Grams Kilo grams cm Centimeter mm Millimeter Inch Foot Mile Met...

Page 15: ...ocouple Type N Thermocouple 3 wire RTD Pt100 199 to 600 C 328 to 1112 F or 199 9 to 600 0 C 328 0 to 1112 0 F 0 0 to 1771 0 C 32 0 to 3219 0 F 0 0 to 1768 0 C 32 0 to 3214 0 F 0 0 to 1826 0 C 32 0 to...

Page 16: ...ator enters the password that matches with this parameter value Settings Default Value Parameter Description This parameter enables or disables the PV monitoring for Min Max values Set to Yes for enab...

Page 17: ...required by the host 1 to 127 Default 1 SERIAL WRITE PERMISSION Setting to No disallows the host to set modify any parameter value The host however can read the value Yes No Default No User Manual ne...

Page 18: ...n this section Table 8 1 Settings Default Value Parameter Description Enable Disable user linearisation feature USER LINEARIZATION Select number of segments for the purpose of input PV curve linearisa...

Page 19: ...assembly can be removed from the plastic enclosure and placed back as described and illustrated in Figure 9 2 Figure 9 1 P P I neuro100EX NO C NO NO NO C C C RLY RLY RLY RLY SSR DC Lin OP 1 SSR DC Li...

Page 20: ...The electronics assembly comes out with the bezel Placing Assembly Back into Enclosure Hold the Enclosure and the Bezel such that the Latching Slot on the Enclosure and the Pullout Latch on the Bezel...

Page 21: ...2 using Shorting Link as shown in Figure 9 4 a Figure 9 4 a For Input Types Thermocouples RTD Pt100 mV V 1 2 3 Figure 9 4 b For Input Types DC Linear Current mA 1 2 3 OUTPUT 1 Jumper Settings The Out...

Page 22: ...et that can directly fit into corresponding male plugs provided on either Output PCB OP2 OP3 OP4 or CPU PCB OP5 Refer Figure9 5 a 9 5 b These modules are either pre fitted while the indicator is shipp...

Page 23: ...Mouldes Figure 9 5 b Figure 9 6 User Manual neuro 100EX Power Supply PCB Placing Back CPU PCB Output PCB Removal OP5 OP2 OP3 OP4 Output PCB 5 Pin Male Plug 4 Pin Male Plug OP2 OP3 OP4 5 Pin Male Plug...

Page 24: ...s back for removal For OP5 module push the module towards right for mounting and pull the module towards left for removal a Relay SSR Module The Relay SSR Module is supported by OP2 OP3 OP4 The module...

Page 25: ...appropriate parameter settings DC Voltage Current Module Figure 9 8 Serial Communication Plug in Module The 8 Pin Male Plug for mounting the Serial Communication Module is located on the Power supply...

Page 26: ...in 0 8 mm Front View PANELCUTOUTAND RECOMMENDED MINIMUM SPACING The Figure 10 2 shows the panel cutout requirements for a single indicator and also the minimum spacing recommended if several indicato...

Page 27: ...xt Voltage B B GND SERIAL COMM 85 to 265 VAC 1 2 3 4 5 6 7 8 9 10 NO C RLY DC LINEAR DI 1 DI 2 SSR DC Lin OP 5 T C Pt100 31 32 33 34 35 36 37 38 39 PPI neuro 102 EX Sr No IO Code Tighten the screw Pan...

Page 28: ...d duration or short circuits on loads 5 Take care not to over tighten the terminal screws while making connections 6 Make sure that the indicator supply is switched off while making removing any conne...

Page 29: ...nk Refer Section 9 HardwareAssembly and Configurations Input Jumper Settings Figure 11 2 d 31 32 33 User Manual neuro 100EX The Electrical Connection Diagram is shown on the left side of the indicator...

Page 30: ...allation should be rigidly observed Consideration should be given to prevention of access to the Power Supply terminals by unauthorized personnel As standard the indicator is supplied with power conne...

Page 31: ...nt command Figure 11 6 34 35 DI 1 If the Optional plug in communication board is fitted connect terminal 7 and 8 of the indicator to and terminals of the Master device For reliable noise free communic...

Page 32: ...a n e t Process Precision Instruments 101 Diamond Industrial Estate Navghar Vasai Road E Dist Palghar 401 210 Maharashtra India 0250 2391722 33 37 42 07498799226 09321985369 support ppiindia net sales...