24
MECHANICAL INSTALLATION
The following precautions should be strictly observed while installing the indicator:
1. The place of installation should be free of corrosive / combustible gases and electrically conductive pollution.
2. Ensure that the place of installation is not subject to rapid ambient changes that can cause condensation. Also the Ambient
Temperature and Relative Humidity surrounding the indicator should not exceed the maximum specified for the proper
operation of the indicator.
3. The place of installation should be adequately protected against excessive electrostatic or electromagnetic interference.
4. The indicator should not be subject to direct vibration or shock.
5. The indicator should not be exposed to dust, salt air, direct sunlight or radiant heat.
OUTER DIMENSIONS
The Figure 10.1 shows the outer dimensions of the indicator.
Figure 10.1
Side View
100 mm
(4 in)
0.8 mm
Front View
PANEL CUTOUT AND RECOMMENDED MINIMUM SPACING
The Figure 10.2 shows the panel cutout requirements for a single indicator and also the minimum spacing recommended if
several indicators are required to be mounted on a single panel.
PANEL MOUNTING
Follow the steps below for mounting the indicator on panel:
1. Prepare a square cutout to the size shown in
Figure 10.2.
2. Remove the Panel Mounting Clamp from the indicator Enclosure.
3. Insert the rear of the indicator housing through the panel cutout from the front of the mounting panel.
4.
Hold the indicator gently against the mounting panel such that it positions squarely against the panel wall (see Figure
10.3). Apply pressure only on the bezel and not on the front label.
5.
Fix the Mounting Clamps (one after the other) such that the metallic projection fits in the square hole provided on the top
and bottom sides of the enclosure. Tighten the clamp screw until the clamps firmly secures against the panel wall.
User Manual
neuro 100EX
Section 10
PPI
neuro 100 EX
96 mm
(3.78 in)
96 mm
(3.78 in)
ACK
OPR
AL3
AL4
AL1
AL2