6th Step:

 With the operator unlocked, position the rack bar over the gear and 

aligned with the gate.

It is necessary to leave approximately a 2mm gap between the top of the gear 

tooth and the bottom of the rack tooth.

7th Step:

 Fix the rack along the entire length of the gate leaf with welding or screw 

every 300 or 400 mm.

GAP 2 mm

300 OR

400 mm

300 OR

400 mm

8th Step:

 If the gate leaf is warped, provide wedges to ensure rack alignment. 

There are cases where the rack will need to extend the length of the leaf. In this 

case, provide a french hand so that you don’t jump your teeth when starting the 

machine.

9th Step:

 After fixing the rack, permanently fix the operator on the floor or concrete 

base, tightening the screws permanently.

FRENCH HAND

DEFINITELY TIGHTEN S 

1/4 X 2 1/2 SCREWS FOR 

FIXING

DEFINITELY TIGHTEN S 

1/4 X 2 1/2 SCREWS FOR 

FIXING

Summary of Contents for DZ RIO

Page 1: ...l manual P30454 04 2022 Rev 0 Made by Motoppar Ind stria e Com rcio de Automatizadores Ltda Av Dr Labieno da Costa Machado 3526 Distrito Industrial Gar a SP CEP 17406 200 Brasil CNPJ 52 605 821 0001 5...

Page 2: ...equired on the equipment identification label Do not turn on the mains until the installation maintenance is completed Make the electrical connections of the command board always with the power grid t...

Page 3: ...SLIDING SLIDING SLIDING SLIDING MODEL THREE PHASE THREE PHASE THREE PHASE THREE PHASE RATED VOLTAGE 127V 220V 127V 220V 127V 220V 127V 220V NOMINAL FREQUENCY 60 Hz 60 Hz 60 Hz 60 Hz RATED POWER 340 W...

Page 4: ...use must be a flexible cable 3 x 0 75 mm 500 V according to the NBR standard NM 247 5 The power conductor of a product for external use must be a flexible cable 3 x 0 75 mm 500 V as per the standard I...

Page 5: ...The system that uses a straight section Picture A angle presents greater friction and consequently greater wear The circular section Picture B allows for better gate displacement and less friction for...

Page 6: ...EAF SIDE VIEW CONCRETE BASE 4th Step Pre align the operator to the gate positioning the rack over the gear and leaning the set against the gate Then mark the fixing holes in the floor or concrete base...

Page 7: ...mm GAP 2 mm 300 OR 400 mm 300 OR 400 mm 8th Step If the gate leaf is warped provide wedges to ensure rack alignment There are cases where the rack will need to extend the length of the leaf In this ca...

Page 8: ...REED This magnet will act as a closing limit switch MAGNET SUPPORT MAGNET SUPPORT REED SUPPORT UPPER VIEW GATE CLOSING 2nd Step Fully open the gate and place the other magnet support on the rack faci...

Page 9: ...maintenance it is necessary to completely disconnect the electrical network DEFECTS PROBABLE CAUSES CORRECTIONS Motor does not start does not move A Power off B Open blown fuse C Locked gate D Defecti...

Reviews: