background image

6

7

TOOLS REQUIRED FOR INSTALLATION

Below are some tools needed to install the operator:

ELECTRICAL INSTALLATION

For electrical installation, the network must contain the following characteristics:

- Mains 127 V or 220 V;

- Have 5 A circuit breakers in the electrical energy distribution box;

- 3/4” diameter conduits between the electrical power distribution box and the 

total shutdown device;

- 3/4” diameter conduits between the total shutdown device and the operator 

connection point;

- 1/2” diameter conduits for external and optional push buttons;

- 1/2” diameter conduits for safety photocells (optional).

-The cable for the fixed wiring must comply with NBR NM 247-3;

-The power conductor, of a product for internal use, must be a 

flexible cable 3 x 0.75 mm²; 500 V, according to the NBR standard 

NM 247-5;

-The power conductor, of a product for external use, must be a 

flexible cable 3 x 0.75 mm²; 500 V, as per the standard IEC 60245-

57.

PLIERS

SAW ARCH

CANNON KEY

SCREWDRIVER

FIXED KEY

LADDER

SOLDERING MACHINE

HAMMER

LEVEL

TAPE

FRAME

DRILLING

MACHINE

PENCIL

SANDER

CARE WITH THE ELECTRICAL 
INSTALLATION

To avoid damage to the wiring, it is important that all conductors are correctly 

attached to the operator. The passage of the wiring must be done through conduits, 

passing internally through the base of the floor, ensuring that none of the wiring 

conductors is trapped and damaged.

It is mandatory that the 

Ground terminal be connected 

to the network Ground cable.

IMPORTANT

The instrument must be powered via a residual differential current 

(DR) device with a rated residual operating current exceeding 30 

mA.

DISCONNECTION 

MEANS

CONDUIT

Summary of Contents for DZ RIO

Page 1: ...l manual P30454 04 2022 Rev 0 Made by Motoppar Ind stria e Com rcio de Automatizadores Ltda Av Dr Labieno da Costa Machado 3526 Distrito Industrial Gar a SP CEP 17406 200 Brasil CNPJ 52 605 821 0001 5...

Page 2: ...equired on the equipment identification label Do not turn on the mains until the installation maintenance is completed Make the electrical connections of the command board always with the power grid t...

Page 3: ...SLIDING SLIDING SLIDING SLIDING MODEL THREE PHASE THREE PHASE THREE PHASE THREE PHASE RATED VOLTAGE 127V 220V 127V 220V 127V 220V 127V 220V NOMINAL FREQUENCY 60 Hz 60 Hz 60 Hz 60 Hz RATED POWER 340 W...

Page 4: ...use must be a flexible cable 3 x 0 75 mm 500 V according to the NBR standard NM 247 5 The power conductor of a product for external use must be a flexible cable 3 x 0 75 mm 500 V as per the standard I...

Page 5: ...The system that uses a straight section Picture A angle presents greater friction and consequently greater wear The circular section Picture B allows for better gate displacement and less friction for...

Page 6: ...EAF SIDE VIEW CONCRETE BASE 4th Step Pre align the operator to the gate positioning the rack over the gear and leaning the set against the gate Then mark the fixing holes in the floor or concrete base...

Page 7: ...mm GAP 2 mm 300 OR 400 mm 300 OR 400 mm 8th Step If the gate leaf is warped provide wedges to ensure rack alignment There are cases where the rack will need to extend the length of the leaf In this ca...

Page 8: ...REED This magnet will act as a closing limit switch MAGNET SUPPORT MAGNET SUPPORT REED SUPPORT UPPER VIEW GATE CLOSING 2nd Step Fully open the gate and place the other magnet support on the rack faci...

Page 9: ...maintenance it is necessary to completely disconnect the electrical network DEFECTS PROBABLE CAUSES CORRECTIONS Motor does not start does not move A Power off B Open blown fuse C Locked gate D Defecti...

Reviews: