
A---22
Powerware BPIV Parallel Cabinet Installation and Operation
164201409 REV. B
101503
DESCRIPTION:
DATE:
DRAWING NO:
SHEET:
REVISION:
B
3 of 8
101503
PARALLEL CABINET POWER TERMINALS
164201409---6
(SEE SHEET 5
FOR DETAILS)
AC INPUT TO BYPASS
(A, B, C, N)
AC OUTPUT TO
CRITICAL LOAD
(A, B, C, N)
LOCATION OF PARALLEL CABINET TERMINALS
POWERWARE BPIV 15 kVA and 30 kVA
15 kVA 1+1, 2+0, 2+1, 3+0, and 3+1 Configuration
30 kVA 1+1, 2+0, and 2+1 Configurations