background image

5401591 - REV A

   •  

 

1/20

 page 4 OF 12

Potter Electric Signal Company, LLC

      •   

 St. Louis, MO

      •   

 Phone: 800-325-3936

      •   

 www.pottersignal.com

RBVS

Universal Ball Valve/Solenoid 

Coil Supervisory Switch

Installation on Tee Handle Valves

1.  Select Clamp Mounting Kit (clamps and screws) based upon pipe/valve 

size, see Mounting Configuration Table 1.

2.  Insert rubber clamp grippers into clamps, See Fig. 4.
3. 

Insert screws into mounting clamp-vee, then place over pipe.

Note:

 If using Blue Mounting Kit, place washer on screw before 

inserting into clamp-vee.

4. 

Place second clamp-vee over the screws from step 3. Then thread 

hex nuts onto the screws, but do not fully tighten, (be sure hex nuts 

seat properly in clamp hex recesses).

5. 

Position  clamp-vee  assembly  so  that  the  RBVS  actuator  will 

contact the tee-valve handle approximately ½” from the end of 

the tee-handle. See Fig 4 for approximate location. Make sure the 

top face of the clamp-vee assembly is parallel with the tee handle 

when tightening screws.

6. 

Tighten screws alternately to 30 in-lbs. (Minimum) of torque.

7. 

Loosely attach “L” bracket-mounting parallel to the pipe with the 

vertical edge facing the tee handle by using the 1/4-20 x 3/4” bolt 

and washer out of the Red bag. Then loosely attach the bracket-

offset to the “L” bracket-mounting

8. 

Attach  RBVS  switch  enclosure  to  the  bracket-offset  with  two 

tamper resistant screws from the Red bag, but do not tighten fully. 

See Fig. 4.

9.  place Tee handle valve in the desired position to monitor.
10.  Slide loosely assembled RBVS switch enclosure to a position that 

permits the actuator to contact the tee handle. Cut and remove 

the plastic coating from the ball valve handle to allow the RBVS 

actuator to contact and be activated by the metal of the handle.

11. 

Tighten “L” bracket-mounting hex bolt to 30 in-lbs. (Minimum) 

of torque. 

12.  Remove the RBVS switch enclosure cover.
13. 

Slide  RBVS  enclosure  down  “L”  bracket-mounting  until  the 

housing contacts the tee-valve handle. Securely tighten the two 

tamper resistant screws. This will ensure the actuator is fully 

depressed. 

BRACKET-EXTENSION (14)

RBVS

PIPE

SOME INSTALLATIONS MAY

CAUSE INTERFERENCE

BETWEEN MOUNTING BOLT AND

BRACKET EXTENSION. INSTALL 

BOLT FROM BOTTOM AND TRIM AS

NEEDED TO CORRECT

BALL VALVE BEING MONITORED IN THE OPEN POSITION

Fig 3

CLAMP GRIPPERS (2,6)

BOLT 1/4-20

(18)

“L” BRACKET-

MOUNTING

(13)

TEE HANDLE VALVE BEING MONITORED IN THE OPEN POSITION

NUT-KEPS (20)

WASHER 1/4” (19)

RBVS SWITCH ENCLOSURE

BRACKET-OFFSET

(15)

CLAMPS

(1,5)

TAMPER RESISTANT

SCREWS

(17)

Alternate Lever Handle Valve Mounting

Typical Tee Handle Ball Valve 

Mounting

Fig 4

14.  Close and open the valve to verify operation. The valve handle may 

“trim” some material off the actuator during the first few operations.

15. 

Place tee-handle valve in supervised position.

16.  Wire main switch and tamper switch (if required). If required, 

carefully route tamper switch wires through strain relief slot 

in switch enclosure. Fully seat the wires into the bottom of the 

channel. See Fig. 1.

17.  Replace RBVS switch enclosure cover and securely tighten cover 

screws to 10 in-lbs minimum. See notice on page 6.

RBVS SWITCH ENCLOSURE

"L" BRACKET-MOUNTING (13)

TAMPER RESISTANT SCREWS (17)

BRACKET EXTENSION (14)

GRIPPERS (2,6)

CLAMPS (1,5)

SCREWS-MACHINE (3,7)

1/2"-2" BALL VALVE

WASHER 1/4" (19)

BOLT 1/4"-20 (18)

Typical Lever Handle Valve Mounted 

in the Closed Position 

Fig 5

Summary of Contents for RBVS

Page 1: ...dd to the mounting flexibility of the RBVS See Typical Mounting Diagrams and Installations and Operation on following pages Technical Specifications Dimensions With Large Clamps 6 L x 5 W x 5 3 H 15 2 cm L x 12 7 cm W x 13 2 cm H With Small Clamps 6 L x 4 W x 5 3 H 15 2 cm L x 10 2 cm W x 13 2 cm H With Solenoid ClampAssembly 5 1 Lx 3 3 Wx 6 H 13 cm Lx 8 38 cm W x 15 24 cm H Shipping Weight 1 65 l...

Page 2: ...EPS 8 32 HEX STEEL ZINC PLATED 2 21 BRACKET SOLENOID MOUNTING 1 Pipe Size Valve Supervise Open Closed Valves Valve Handle Type Use Bag Color Use Item Number Item xQty Clamps Grippers Item xQty Brackets Item Hardware Item xQty 1 2 to 3 4 12 5 to 19mm Open Lever Fig 1 2 White Red Mounting Kit 1 x2 2 x2 13 3 x2 4 x2 16 17 x2 18 19 1 x2 2 x2 13 14 3 x2 4 x2 16 17 x2 18 x2 19 x2 Tee Fig 4 1 x2 2 x2 13 ...

Page 3: ...g but do not tighten fully 11 Place ball valve in the desired position to monitor 12 Position L bracket mounting so that it contacts the back edge of the valve handle and secure its hex bolt It may be necessary to close open valve to access this bolt 13 Slide loosely assembled RBVS switch enclosure to a position that permits the actuator to contact the valve handle Cut and remove the plastic coati...

Page 4: ...ntact the tee handle Cut and remove the plastic coating from the ball valve handle to allow the RBVS actuator to contact and be activated by the metal of the handle 11 Tighten L bracket mounting hex bolt to 30 in lbs Minimum of torque 12 Remove the RBVS switch enclosure cover 13 Slide RBVS enclosure down L bracket mounting until the housing contacts the tee valve handle Securely tighten the two ta...

Page 5: ...il Tighten alternately to 30 in lbs minimum of torque 8 Attach the L bracket mounting to the top clamp vee using the 20 X hexboltandwasheroutoftheRedbag Donotfullytightenhexbolt Makesureverticalslotonthe L mounting bracketisclosertothecenter of the solenoid coil See fig 6 9 Attach the bracket mounting solenoid from the Red bag to the RBVS through the two smaller slots in the bracket with two tampe...

Page 6: ...k dry pipe or preaction deluge valves Locations shall be as indicated on drawings and plans and as required by applicable local and national codes and standards The supervisory switch shall monitor the position of the handle on the valve and be capable of monitoring a valve in the open or closed position Movement of the valve handle from normal shall activate the supervisory switch Restoration of ...

Page 7: ...ypiques et Installations et fonctionnement sur les pages suivantes Spécifications techniques Dimensions Avec des grandes pinces 6 po x 5 po x 5 3 po 15 2 cm Lx 12 7 cm l x 13 2 cm H Avec des petites pinces 6 po x 4 po x 5 3 po 15 2 cm Lx 10 2 cm l x 13 2 cm H Avec l assemblage de la pince à électrovanne 5 1 po x 3 3 po x 6 po 13 cm Lx 8 38 cm l x 15 24 cm H Poids d expédition 0 74 kg 1 65 lb Encei...

Page 8: ...CROU KEPS NO 8 32 HEXAGONAUX EN MÉTAL PLAQUÉ ZINC 2 21 SUPPORT FIXATION DU SOLÉNOÏDE 1 Taille du tuyau vanne Vannes en position supervisée ouverte fermée Type de poignée de la vanne Utilisez la couleur du sac Utilisez le numéro d article Numéro d article quantité Colliers pinces Numéro d article quantité Supports Numéro d article Matériel Numéro d article quantité 1 2 po à 3 4 po 12 5 à 19 mm Ouvr...

Page 9: ...pas serrer entièrement 11 Placez le clapet à bille dans la position souhaitée pour surveiller 12 Placez le support de montage en L afin qu il entre en contact avec le bord arrière de la poignée de la vanne et fixez son boulon hexagonal Dans certains cas il peut être nécessaire de fermer d ouvrir la vanne afin d accéder au boulon 13 Faites glisser l enceinte de l interrupteur RBVS montée sans serra...

Page 10: ...ermet à l actionneur d entrer en contact avec la poignée en T Découpez et enlevez le revêtement en plastique de la poignée du clapet à bille afin de permettre à l actionneur RBVS d entrer en contact et d être activé par le métal de la poignée 11 Serrez le boulon hexagonal du support de montage en L à 30 po lb minium de couple 12 Enlevez le couvercle de l enceinte de l interrupteur RBVS 13 Faites g...

Page 11: ...n V à l aide d un boulon et d une rondelle hexagonale 20 X du Sac rouge Ne pas trop serrer le boulon hexagonal Veillez à ce que la fente verticale sur support de montage en L soit plus près du centre de la bobine de solénoïde Voir Image 6 9 Fixez le support de montage du solénoïde du Sac rouge au RBVS via les deux fentes plus petites dans le support à l aide de deux vis inviolables 10 Faites gliss...

Page 12: ...exigé par les normes et codes locaux et nationaux d application L interrupteur de surveillance des crosses devra surveiller l emplacement de la poignée sur la vanne et être capable de surveiller une vanne en position ouverte ou fermée Le mouvement de la poignée de la vanne à partir de l état normal devra activer l interrupteur de surveillance des crosses La réparation de la poignée de la vanne fer...

Reviews: