background image

5401591 - REV A

   •  

 

1/20

 page 2 OF 12

Potter Electric Signal Company, LLC

      •   

 St. Louis, MO

      •   

 Phone: 800-325-3936

      •   

 www.pottersignal.com

RBVS

Universal Ball Valve/Solenoid 

Coil Supervisory Switch

Mounting kits

Table 1: Mounting Configurations

Bag 

Color

Item 

No.

Description

Qty

Illustration

White 

Mounting

Kit

1

CLAMP-VEE (SMALL)

2

2

GRIPPER-RUBBER 

(SMaLL)

2

3

SCREW-MACHINE #10-32 

X 2-1/2”

2

4

NUT-HEX #10-32 STEEL/ 

ZINC PLATED

2

Blue 

Mounting 

Kit

5

CLAMP-VEE (LARGE)

2

6

GRIPPER-RUBBER 

(LaRge)

2

7

SCREW-1/4-20 X 4” HEX 

WASHER HD ZINC

2

8

WASHER-SAE 1/4”

2

9

NUT-HEX 1/4-20

2

Clear 

Solenoid 

Mounting 

Kit

10

CLAMP-VEE SOLENOID 

(SMaLL)

1

Clear 

Solenoid 

Mounting 

Kit

11

NUT-HEX #10-32 STEEL/

ZINC PLATED

2

12

SCREW-MACHINE #10-32 

X 1-3/4”

2

Red 

Bracket-

Hardware 

Kit

13

“L” BRACKET-MOUNTING

1

14

BRACKET-EXTENSION

1

15

BRACKET-OFFSET

1

16

KEY-HEX TAMPERPROFF 

HOLE ONE END

1

17

SCREW-TAMPER 

RESISTANT #8-32 X 1/2”

4

18

BOLT 1/4-20 X 3/4 HEX HD 

Cap SCReW

2

19

WASHER-SAE 1/4”

2

20

NUT-KEPS #8-32 HEX 

STEEL / ZINC PLATED

2

21

BRACKET-SOLENOID 

MOUNTINg

1

pipe Size/Valve Supervise Open/

Closed Valves

Valve 

Handle 

Type

Use Bag 

Color

Use Item Number: Item # (xQty)

Clamps/grippers

Item # (xQty)

Brackets

Item #

Hardware: Item # (xQty)

1/2” to 3/4” 

(12,5 to 19mm)

Open

Lever

(Fig 1&2)

White/Red 

Mounting Kit

1(x2), 2(x2)

13

3(x2), 4( x2), 16, 17(x2), 18, 19

1(x2), 2(x2)

13, 14

3(x2), 4( x2), 16, 17(x2), 18(x2), 19(x2)

Tee (Fig 4)

1(x2), 2(x2)

13, 15

3(x2), 4( x2), 16, 17(x4), 18, 19, 20(x2)

1/2” to 3/4” 

(12,5 to 19mm)

Closed

Lever

(Fig 5)

White/Red 

Mounting Kit

1(x2), 2(x2)

13, 14

3(x2), 4( x2), 16, 17(x2), 18(x2), 19(x2)

Tee

1(x2), 2(x2)

13, 14, 15

3(x2), 4( x2), 16, 17(x4), 18(x2), 19(x2), 20(x2)

1”  to  2”               

(25 to 50mm)

Open

Lever

 (Fig 1&2)

Blue/Red 

Mounting Kit

5(x2), 6(x2)

13

7(x2), 8(x2), 9( x2), 16, 17(x2), 18, 19

5(x2), 6(x2)

13, 14

7(x2), 8(x2), 9( x2), 16, 17(x2), 18(x2), 19(x2)

Tee

 (Fig 4)

5(x2), 6(x2)

13, 15

7(x2), 8(x2), 9( x2), 16, 17(x4), 18, 19,  20(x2)

1”  to  2”                

(25 to 50mm)

Closed

Lever

(Fig 5)

Blue/Red 

Mounting Kit

5(x2), 6(x2)

13, 14

7(x2), 8(x2), 9( x2), 16, 17(x2), 18(x2), 19(x2)

Tee

5(x2), 6(x2)

13, 14, 15

7(x2), 8(x2), 9( x2), 16, 17(x4), 18(x2), 19(x2), 20(x2)

1/2” Solenoid 

Conduit 

“Nipple”

-

1/2 

Solenoid 

Valve

(Fig 6)

White/Clear/

Red Solenoid 

Mounting Kit

1, 2(x2), 10

13, 21

11(x2), 12(x2), 16, 17(x4), 18, 19, 20(x2)

Summary of Contents for RBVS

Page 1: ...dd to the mounting flexibility of the RBVS See Typical Mounting Diagrams and Installations and Operation on following pages Technical Specifications Dimensions With Large Clamps 6 L x 5 W x 5 3 H 15 2 cm L x 12 7 cm W x 13 2 cm H With Small Clamps 6 L x 4 W x 5 3 H 15 2 cm L x 10 2 cm W x 13 2 cm H With Solenoid ClampAssembly 5 1 Lx 3 3 Wx 6 H 13 cm Lx 8 38 cm W x 15 24 cm H Shipping Weight 1 65 l...

Page 2: ...EPS 8 32 HEX STEEL ZINC PLATED 2 21 BRACKET SOLENOID MOUNTING 1 Pipe Size Valve Supervise Open Closed Valves Valve Handle Type Use Bag Color Use Item Number Item xQty Clamps Grippers Item xQty Brackets Item Hardware Item xQty 1 2 to 3 4 12 5 to 19mm Open Lever Fig 1 2 White Red Mounting Kit 1 x2 2 x2 13 3 x2 4 x2 16 17 x2 18 19 1 x2 2 x2 13 14 3 x2 4 x2 16 17 x2 18 x2 19 x2 Tee Fig 4 1 x2 2 x2 13 ...

Page 3: ...g but do not tighten fully 11 Place ball valve in the desired position to monitor 12 Position L bracket mounting so that it contacts the back edge of the valve handle and secure its hex bolt It may be necessary to close open valve to access this bolt 13 Slide loosely assembled RBVS switch enclosure to a position that permits the actuator to contact the valve handle Cut and remove the plastic coati...

Page 4: ...ntact the tee handle Cut and remove the plastic coating from the ball valve handle to allow the RBVS actuator to contact and be activated by the metal of the handle 11 Tighten L bracket mounting hex bolt to 30 in lbs Minimum of torque 12 Remove the RBVS switch enclosure cover 13 Slide RBVS enclosure down L bracket mounting until the housing contacts the tee valve handle Securely tighten the two ta...

Page 5: ...il Tighten alternately to 30 in lbs minimum of torque 8 Attach the L bracket mounting to the top clamp vee using the 20 X hexboltandwasheroutoftheRedbag Donotfullytightenhexbolt Makesureverticalslotonthe L mounting bracketisclosertothecenter of the solenoid coil See fig 6 9 Attach the bracket mounting solenoid from the Red bag to the RBVS through the two smaller slots in the bracket with two tampe...

Page 6: ...k dry pipe or preaction deluge valves Locations shall be as indicated on drawings and plans and as required by applicable local and national codes and standards The supervisory switch shall monitor the position of the handle on the valve and be capable of monitoring a valve in the open or closed position Movement of the valve handle from normal shall activate the supervisory switch Restoration of ...

Page 7: ...ypiques et Installations et fonctionnement sur les pages suivantes Spécifications techniques Dimensions Avec des grandes pinces 6 po x 5 po x 5 3 po 15 2 cm Lx 12 7 cm l x 13 2 cm H Avec des petites pinces 6 po x 4 po x 5 3 po 15 2 cm Lx 10 2 cm l x 13 2 cm H Avec l assemblage de la pince à électrovanne 5 1 po x 3 3 po x 6 po 13 cm Lx 8 38 cm l x 15 24 cm H Poids d expédition 0 74 kg 1 65 lb Encei...

Page 8: ...CROU KEPS NO 8 32 HEXAGONAUX EN MÉTAL PLAQUÉ ZINC 2 21 SUPPORT FIXATION DU SOLÉNOÏDE 1 Taille du tuyau vanne Vannes en position supervisée ouverte fermée Type de poignée de la vanne Utilisez la couleur du sac Utilisez le numéro d article Numéro d article quantité Colliers pinces Numéro d article quantité Supports Numéro d article Matériel Numéro d article quantité 1 2 po à 3 4 po 12 5 à 19 mm Ouvr...

Page 9: ...pas serrer entièrement 11 Placez le clapet à bille dans la position souhaitée pour surveiller 12 Placez le support de montage en L afin qu il entre en contact avec le bord arrière de la poignée de la vanne et fixez son boulon hexagonal Dans certains cas il peut être nécessaire de fermer d ouvrir la vanne afin d accéder au boulon 13 Faites glisser l enceinte de l interrupteur RBVS montée sans serra...

Page 10: ...ermet à l actionneur d entrer en contact avec la poignée en T Découpez et enlevez le revêtement en plastique de la poignée du clapet à bille afin de permettre à l actionneur RBVS d entrer en contact et d être activé par le métal de la poignée 11 Serrez le boulon hexagonal du support de montage en L à 30 po lb minium de couple 12 Enlevez le couvercle de l enceinte de l interrupteur RBVS 13 Faites g...

Page 11: ...n V à l aide d un boulon et d une rondelle hexagonale 20 X du Sac rouge Ne pas trop serrer le boulon hexagonal Veillez à ce que la fente verticale sur support de montage en L soit plus près du centre de la bobine de solénoïde Voir Image 6 9 Fixez le support de montage du solénoïde du Sac rouge au RBVS via les deux fentes plus petites dans le support à l aide de deux vis inviolables 10 Faites gliss...

Page 12: ...exigé par les normes et codes locaux et nationaux d application L interrupteur de surveillance des crosses devra surveiller l emplacement de la poignée sur la vanne et être capable de surveiller une vanne en position ouverte ou fermée Le mouvement de la poignée de la vanne à partir de l état normal devra activer l interrupteur de surveillance des crosses La réparation de la poignée de la vanne fer...

Reviews: