Order of Spectra Pro/Image Pro/Minolta Pro System Tests
Tests on Spectra Pro/Image Pro cameras should be performed as described below.
Mandatory Tests
Perform the following tests in the order shown on all cameras:
1. Ambient Exposure at 100 C/FS.
2. Strobe Exposure (Graywall).
Strobe Exposure Test Reading Cannot be Corrected
via IR Exposure Calibration Slide
If the Strobe Exposure (Graywall) test reading is out of specification and cannot be
corrected by adjusting the IR Exposure Calibration Slide, follow the steps below:
1. Perform the ZLS Graywall Test.
•
If the ZLS Graywall Test result is not within spec, replace the Strobe Board or the
Flashtube Assembly as required.
•
If the ZLS Graywall Test is now within spec but the Strobe Exposure (Graywall)
reading remains out-of-spec, go to step 2.
2. Perform the Hybrid (ZLS/Blade Speed) Test.
•
If the Hybrid Test reading is within spec but the Strobe Exposure test reading
remains out of spec, replace the exposure flex and retest.
•
If the Hybrid Test reading is out-of-spec, perform the Hybrid Adjustment
(Opening Blade Spring). If this adjustment brings the reading within
specification, discontinue testing. If the adjustment fails to bring the reading
within specification, go to step 3.
Summary of Contents for Spectra/Image One Board
Page 35: ...35 Figure 3 7 Star tester 12650 3 controls and indicators see text for descriptions...
Page 38: ...38 Figure 3 10 Positioning camera on horn against star tester Guide Tab...
Page 75: ...75 Figure 4 5 Spectra pro image pro minolta pro system schematic...
Page 76: ...76 Figure 4 6 One board strobe exposure module schematic...
Page 77: ...77 Figure 4 7 Ranging board schematic...
Page 78: ...78 Figure 4 8 Features module and display module schematic...