
DRIVE / DRIVEN CLUTCHES
5.18
Drive Clutch Assembly
1. Place the correct number of spacer washers
beneath the spider.
2. Assemble clutch making sure “X” marks on movable
sheave and spider, or reference marks made before
disassembly are aligned to achieve proper balance.
NOTE:
If belt to sheave clearance is being changed by
adding or removing washers from under the spider, and
the sheaves were marked before disassembly, follow in-
dexing procedure on page 5.21.
3. Torque spider to specification.
4. Torque jam nut to specification (P-85 Clutches).
Install weights with weight pin nut on trailing side.
Use new nuts to ensure proper retention. Torque nut
to 30 in. lbs.
Spider Torque - P85 and P90
Spider Removal Tool
PN 2870341
200 ft. lbs. (276 Nm)
Jam Nut Torque - P85 models only
Jam Nut Tool
235 ft. lbs. (324.3 Nm)
PN 2870338
Weight Pin Nut Torque
30 In. Lbs. (3.4 Nm)
Marks
Summary of Contents for 600 EDGE RMK
Page 5: ......
Page 7: ......
Page 20: ...GENERAL INFORMATION 1 13 Notes ...
Page 35: ......
Page 37: ......
Page 60: ...MAINTENANCE TUNE UP 2 23 Notes ...
Page 61: ......
Page 63: ......
Page 137: ......
Page 139: ......
Page 177: ......
Page 221: ......
Page 223: ......
Page 259: ......
Page 261: ......
Page 273: ...SUSPENSIONS 7 12 EDGE RMK Exploded view Front Torque Arm Rear Torque ARm ...
Page 308: ...SUSPENSIONS 7 47 Suspension Troubleshooting EDGE RMK ...
Page 309: ......
Page 311: ......
Page 313: ...BRAKES FINAL DRIVE 8 2 ...
Page 314: ...BRAKES FINAL DRIVE 8 3 ...
Page 315: ...BRAKES FINAL DRIVE 8 4 ...
Page 351: ......
Page 353: ......
Page 382: ...ELECTRICAL 9 29 Notes ...
Page 383: ......
Page 384: ...CHAPTER 10 WIRING DIAGRAMS ...
Page 385: ......
Page 390: ...WIRING DIAGRAMS 10 1 TRAIL RMK ...
Page 391: ...ELECTRICAL 10 2 INDY 500 RMK 500 SKS EURO ...
Page 392: ...WIRING DIAGRAMS 10 3 INDY 700 SKS INDY 600 700 800 EDGE RMK ...