19
GB
ON/OFF
AUTO
PROG
ON/OFF
AUTO
PROG
2
Electric connections
Connection of the antenna.
To ensure optimum operation, it is recommended
to introduce the antenna cable through
a cable bush.
Never cut the antenna cable.
Connection to the mains or solar system
In the case of supply from a solar system, see page 35.
For safety reasons, these operations must be carried out
with the power supply disconnected.
1. Insert the cable into the gland.
2. Connect the earth wire.
The earth wire (green-yellow) will be
needed for some accessories
(lighting 230 V Class I).
3. Connect the live and the neutral.
Check if the wires are locked properly by
pulling them.
It is necessary to always follow the rules
regarding cable colours without variation.
Blue wire
Neutral
Red-brown-black wire
Live
Green-yellow wire
Earth
4. Clamp the gland. Check if the wire is locked properly by pulling it.
Summary of Contents for EASY WAY201
Page 1: ...DRIVE UNIT FOR SWING GATES EASY WAY 201 ...
Page 9: ...9 GB 6 5 7 5 10 5 13 10 Preparation for assembly Necessary tools ...
Page 37: ...37 GB ...
Page 38: ...38 GB ...
Page 39: ...39 GB ...