GB
TRANSPORT POSITION
WORKING POSITION
- 11 -
9800-GB TRANSPORT (374)
Conversion from transport to working
position
• Changing from working position to transport position
is only to be carried out on even, firm ground.
Work steps
- see previous page, however in reverse order.
FETT
TD49/93/2
Garaging the implement
-
Garage implement only in the working position
-
Pull support stands (left and right) out and secure with spring pin.
-
If the ground is soft, increase the standing surface of the support
stands with an appropriate base.
Before uncoupling the hydraulic hoses
• Open valve completely
- Turn control knob (P) to the left (a) until it stops.
• Move control valve (EW) to „lower“ position
This will release any possible residual pressure present in the
lines.
TD 79/98/13
Parking in the open
When parking in the open for long periods of time, clean plunger
rods and then coat with grease.
EW
2
EW
1
EW
3
DW
1
TD 79/98/08
EW
DW