User’s Manual of WGSW-24040 / WGSW-24040R
Figure 2-7
Place the Managed Switch on the desktop
Step3:
Keep enough ventilation space between the Managed Switch and the surrounding objects.
When choosing a location, please keep in mind the environmental restrictions discussed in Chapter 1,
Section 4, and Specification.
Step4:
Connect the Managed Switch to network devices.
Connect one end of a standard network cable to the 10/100/1000 RJ-45 ports on the front of the Managed Switch
Connect the other end of the cable to the network devices such as printer servers, workstations or routers…etc.
Connection to the Managed Switch requires UTP Category 5 network cabling with RJ-45 tips. For more
information, please see the Cabling Specification in Appendix A.
Step5:
Supply power to the Managed Switch.
Connect one end of the power cable to the Managed Switch.
Connect the power plug of the power cable to a standard wall outlet.
When the Managed Switch receives power, the Power LED should remain solid Green.
2.2.2 Rack Mounting
To install the Managed Switch in a 19-inch standard rack, please follows the instructions described below.
Step1:
Place the Managed Switch on a hard flat surface, with the front panel positioned towards the front side.
Step2:
Attach the rack-mount bracket to each side of the Managed Switch with supplied screws attached to the package.
Figure 2-8
shows how to attach brackets to one side of the Managed Switch.
34
Summary of Contents for WGSW-24040
Page 1: ...User s Manual of WGSW 24040 WGSW 24040R 1 ...
Page 20: ...User s Manual of WGSW 24040 WGSW 24040R APPENDEX B GLOSSARY 558 20 ...
Page 48: ...User s Manual of WGSW 24040 WGSW 24040R Figure 4 1 5 Managed Switch Main Functions Menu 48 ...
Page 338: ...User s Manual of WGSW 24040 WGSW 24040R 338 ...
Page 466: ...User s Manual of WGSW 24040 WGSW 24040R WGSW 24040 Aggr mode smac disable 466 ...