Instruction Manual
DM08
7 Commissioning
Before switching on the DM08 for the first time, please observe the following instructions.
Check that
the DM08 has been installed correctly and that all screw connections are sealed.
the electrical wiring has been connected properly.
the measuring system is vented by flushing.
Startup conditions:
The device is not subject to specific startup conditions. However, pressure surges should be
avoided.
Change the orientation of the display electronics (only compact version)
The display electronics of the compact version isn't rigidly connected to the sensor but can be
turned by ± 180°.
The display electronics has been factory-installed so that in case of a horizontal piping and a flow
direction from left to right the set orientation is in the correct position.
Follow the steps to change the orientation of the display electronics:
Loosen the two setscrews
.
Turn the display electronics in the desired position.
Tighten the two setscrews
again.