3.2. Removal of Temporary Transport Beams and Fixation of the Machine
Use a pallet truck/a crane to lift the machine and place it directly on the desired location in the workplace. Unscrew the bolts that hold
the machine in place and remove the transport beams. Lift the machine with a crane, remove the beams and lower the machine onto
the floor. Level the machine by laying metal sheets under its legs, possibly anchor to the floor. Remove the anticorrosion film and dust
from sliding surfaces and apply oil. Ensure connection to the mains (see section 3.4.). Pour the coolant (maximum 30 litres) into the
tank; the fluid will gradually flow into the container in the base. The hydraulic unit is fitted with two filling holes that are covered by red
transport caps during the transport (see section 6.5.). The cap that is more accessible to the operator has to be removed and
replaced by a filling cap, otherwise a risk of making the entire system inoperable arises, along with the risk of pump damage.
When handling coolants, risks linked to hazardous substances cannot be avoided. Observe the national
norms and recommendations/manufacturer’s or your company’s operating instructions related to safe
handling of coolants.
3.3. Machine installation
Protect the machine against humidity, rain and dust!
The machine may be operated in the ambient temperature b 5° and + 40°C. The average air temperature must not
35°C within 24 hours.In temperatures below + 5°C the conventional coolants should be replaced by coolants designed for respective
temperatures. In addition to that, replace the oil in the hydraulic unit for a less viscous one.
3.4. Connection to the Mains
Such operations must be carried out only by persons with electrician qualifications!
Make sure that the grid voltage, the voltage protection and the connection voltage comply with the power requirements specified in
the point 2. Technical parameters. Only current protection of S characteristics can be installed (for a frequency converter). When
connecting the machine to the mains (3 NPe 50 Hz, 400 V, TN-S),
mind the colour coding of wires carefully: L1
brown,
L2
black,
L3
grey,
N
blue,
PE
yellow-brown.
Improper connection of the neutral or PE wires may lead to damage of the electrical
equipment or to and electric shock!
Connect the power cable to a protected 16 A socket, in case of direct connection to the mains it
is necessary to fit the supply with a lockable Power switch. If the motor rotates in an incorrect direction, swap the conductors
L1
brown and
L2
black on the junction box.
Failure to observe the aforementioned may lead to incorrect rotation of the bandsaw and the coolant pump.
Danger: Damage to the machine!
3.5. Releasing the ARG 520 DC CF-NC
The arm is fastened to both columns for transport. Release the arm by removing the M10x60 Allen bolts on both columns.
Note:
During operation, ensure a clearance of approximately 5 mm between the M16x45 setting screws and the saw arm in the
lower position with the moving guide fully open. Set during machine assembly.
ALLEN BOLT M10x60
FOOT SCREW M16x45