onlinecomponents.com
Installation, Displays and Operating Keys
6170
B
12
4.1.1
Replacing Terminals
4.1.2
Adjusting the Length of the Process Data
If the object 5FFB is 0 (state of delivery) the length of the process data is set by
the J1... J3 on the
left
terminal block.
The jumpers have to be set as follows:
J1 between terminal 1.0 and 2.0
J2 between terminal 1.1 and 2.1
J3 between terminal 1.2 and 2.2
Length of the process data:
4.1.3
Connecting the AS-i Circuit
The AS-i circuit is connected to the
right
terminal block. AS-i + is connected to the
terminals 1.0 - 1.3 and AS-i - to the terminals 2.0 - 2.3.
Do not replace terminals while power is connected!
Before removing or mounting a terminal, disconnect power to the
entire station! Make sure the entire station is reassembled before
switching power back on.
J1
J3
J2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
3
7
5
9
11
15
13
1
2
1.2
1.2
1.3
2.1
2.2
2.3
1.0
2.0
AS-i +
AS-i +
AS-i +
AS-i +
AS-i -
AS-i -
AS-i -
AS-i -
Summary of Contents for 27 41 40 6
Page 2: ...o n l i n e c o m p o n e n t s c o m...
Page 4: ...o n l i n e c o m p o n e n t s c o m...
Page 6: ...o n l i n e c o m p o n e n t s c o m 6170B 4...
Page 10: ...o n l i n e c o m p o n e n t s c o m Table of Contents 6170B 4...
Page 12: ...o n l i n e c o m p o n e n t s c o m The Symbols Used 6170B 6...
Page 14: ...o n l i n e c o m p o n e n t s c o m Safety 6170B 8...
Page 16: ...o n l i n e c o m p o n e n t s c o m General Information 6170B 10...
Page 26: ...o n l i n e c o m p o n e n t s c o m Operating the AS i INTERBUS Gateway 6170B 20...
Page 42: ...o n l i n e c o m p o n e n t s c o m AS i INTERBUS Gateway 6170B 36...
Page 46: ...o n l i n e c o m p o n e n t s c o m Appendix Displaying the Figure Display 6170B 40...
Page 50: ...o n l i n e c o m p o n e n t s c o m Technical Data 6170B 44...