20 |
Page
V2.1
Routing Power Cables
Note:
Continuous metal conduit should be used for all power cables to reduce radiated
electromagnetic interference (EMI). The conduit must be securely grounded to the
converter enclosure and the motor case. Conduit hubs should be IMC or rigid steel conduit
and be UL listed. Conduit hub locations can be seen in
Route power cables through the supplied openings in the bottom of the enclosure, using
appropriate conduit or strain relief devices.
Important Note:
If new openings are cut, be sure to completely remove all resulting metal
shavings.
Figure 15
– PT Small Frame Conduit
Locations
Figure 16
– PT Medium Frame Conduit
Locations
Figure 17
– PT Large Frame Conduit Locations
Small Frame Models:
PT407, PT410, PT415,
PT420
Medium Frame Models:
PT007, PT010, PT020,
PT430
Large Frame Models:
PT030, PT040, PT050,
PT060, PT075, PT440,
PT450, PT460, PT475,
PT4100
Summary of Contents for Phase Perfect PT007
Page 13: ...7 Page V2 1 Dimensional Drawings Figure 4 PT Small Frame Dimensions...
Page 14: ...8 Page V2 1 Figure 5 PT Medium Frame Dimensions...
Page 15: ...9 Page V2 1 Figure 6 PT Large Frame Dimensions...
Page 16: ...10 Page V2 1 Figure 7 PTE Frame 1...
Page 17: ...11 Page V2 1 Figure 8 PTE Frame 2...
Page 46: ...40 Page V2 1 NOTES...