27 |
Page
V2.1
Startup Delay
WARNING!
Risk of electric shock. De-energize the unit by disconnecting all incoming
sources of power, then wait 30 minutes for internal charges to dissipate before servicing
the equipment.
Startup Delay will force the converter to wait for a set time period before starting up. This
procedure will require wiring two ON/OFF switches to the converter. Standard light
switches will work. See
for wiring diagram. To add a startup delay, follow the
steps below:
Step
Action
1
Turn power to PT
OFF
2
Remove jumper wire between AUX1
and COM
3
Wire dry contact switch between AUX3
and COM (now called SW3)
4
Wire dry contact switch between AUX4
and COM (now called SW4)
5
Turn power to the PT
ON
6
Toggle
SW4
until you see
STARTUP
DLY 4/5
on screen
7
Toggle
SW3
to select between YES or
NO
8
Wait several seconds to allow this
programming to be saved
9
Repeat steps
6
and
7
10
SW3
ON to access STARTUP DLY
11
SW4
ON to access DLY TIME
Switches now act as toggle to select the
STARTUP DELAY TIME
.
Action
Effect
Toggle
SW3
Decrease delay time
Toggle
SW4
Increase delay time
Wait several seconds until
“
Programmed Successfully
” is shown on the display, and then
return switches to the
OFF
position. Turn power to converter
OFF
, re-install jumper wire
between
AUX1
and
COM
, then reapply power to converter.
Summary of Contents for Phase Perfect PT007
Page 13: ...7 Page V2 1 Dimensional Drawings Figure 4 PT Small Frame Dimensions...
Page 14: ...8 Page V2 1 Figure 5 PT Medium Frame Dimensions...
Page 15: ...9 Page V2 1 Figure 6 PT Large Frame Dimensions...
Page 16: ...10 Page V2 1 Figure 7 PTE Frame 1...
Page 17: ...11 Page V2 1 Figure 8 PTE Frame 2...
Page 46: ...40 Page V2 1 NOTES...