PFT LOTUS XL light 400 V Overview – Operation – Spare Parts Lists
Check list for annual inspection by specialist (master copy)
2017-01-16
55
36 Check list for annual inspection by specialist (master copy)
This inspection must be carried out once a year by a specialist in accordance with BGR 183 (German
Association for Health and Safety at Work). The machine and control box receive an inspection label
as verification of this inspection. The inspection protocol is to be presented on demand.
Date of
inspection:
Inspector:
Signed:
Machine number:
Component
Inspection criterion
OK
Rework /
replace
Motor swivel flange
Check for deformation
Gear motor
Check motor connection cable
Check sealing rings
Inspect coupling claw
Middle body
Gaskets OK?
Bolts and eyebolts OK?
Dosing zone rubber inspected for wear?
Mixing tube
Dosing shaft
Check for wear
Mixing shaft
Check for wear
Coupling
for mixing shaft
Check for wear
Coupling claw
Check for wear
Mortar outlet
Check for wear
Cable set
Check whether all cable connections are firmly seated.
Cable set
Visual inspection for defects
Cable set
Insulation measurement
Cable set
Functional test
Solenoid valve
Functional test
Pressure
reducing valve
Functional test
Type plate
Present and legible
Operating manual
Present