background image

7

The Three Phase Current Motor Circuit 

The three phase motor winding consists of three identical
coils. 

Delta Connection 

The three coils are connected in series with the connection
point connected to the mains. The voltage of each coil is the
same as the mains voltage whereas the mains current is the
cube root of the coil current. Delta connections are denoted
by the symbol 

∆∆

.

The voltage between the mains supply lines is called mains
voltage. The mains current is the current which flows in the
supply lines. 

Star Connection 

The ends of the three coils are connected at the star center.
The terminal voltage is the cube root of the coil voltage; the
mains and the coil current are the same. Star connections are
denoted by the symbol 

Y.

A star connection three phase motor for 400 V mains voltage
has a coil voltage of 230 V.

W2

U1

L1

V2

V1

W1

U2

L3

L2

W2

U2

V2

U1

V1

W1

L1 L2

L3

W2

U1

L1

V2

V1

W1

U2

L3

L2

W2

U2

V2

U1

V1

W1

L1 L2

L3

Motor coil and connecting plate of Delta Connection

Motor coil and connecting plate of Star Connection

Rotation Speed and Operating Hours Monitor RCI 002

3.6. Monitoring Connection

The Rotary Vane Pumps UNO/ DUO 120 A have been designed
so that they can be connected to a Rotation Speed and
Operating Hours Monitor RCI 002, which is connected at
connecting socket 45. For the operation and application of
this device please refer to the relevant operations
instructions.

Important: The instructions in 

4.1.2

must be

observed when working with synthetic
operating medium F5.

CAUTION

3.7. Special Models

Helium Tight and Corrosive Gas Models 

Helium tight and corrosive gas models are becoming
increasingly important.
– Helium tight models are distinguished by their high level

tightness to the atmosphere. Corrosive gas models are
manufactured with special materials. 

– There is a different high vacuum safety valve control. 
– The rotor shaft of both versions is sealed with an

additional radial shaft seal. The cavity between the radial
shaft seals 118 and 133 is filled with operating medium and
is supplied by the oiler 136. 

– If the gas ballast valve 2 is not available, the opening

should be closed with the locking screw 169 or a special
gas ballast valve with dosing device and hose connection
for flushing gas is available (on request). 

– Helium tight models are operated, as standard, with opera-

ting medium P3 and the corrosive gas version with synthe-
tic operating medium F5, also as standard. 

Summary of Contents for DUO 120 A

Page 1: ...Rotary Vane Pumps PK 800 151 BE G 0311 UNO DUO 120 A Betriebsanleitung Operating Instructions...

Page 2: ...p And Checking The Operating Fluid 9 4 1 2 Operating Fluid F5 9 4 2 Switching The Pump ON And OFF 9 4 3 Gas Ballast Valve 10 4 3 1 Standard Model 10 4 3 2 Corrosive Gas Model 10 4 3 3 Magnetic control...

Page 3: ...conversions or modifications on the pump When returning the pump to us please note the shipping instructions in Section 7 1 1 For Your Orientation Instructions in the text Operating instructions Here...

Page 4: ...s manual is not permit ted without authorisation from PFEIFFER Improper use will cause any rights regarding liability and gua rantees to be forfeited Special Models Helium tight model Operating Fluid...

Page 5: ...with operating fluid before operating the first time included in a separate pack in the delivery consignment When transporting use only the eyebolts provided for the purpose When filled with operatin...

Page 6: ...ases on the connecting cable CAUTION CAUTION Switching parts list S3 Control switch S1 Pushbutton OFF S2 Pushbutton ON K1 Contactor F1 3 Motor fuse F5 Control fuse F8 Triggering Unit TMA 4 or TMA 4R H...

Page 7: ...nection The Rotary Vane Pumps UNO DUO 120 A have been designed so that they can be connected to a Rotation Speed and Operating Hours Monitor RCI 002 which is connected at connecting socket 45 For the...

Page 8: ...ing 132 Support washer 133 Radial shaft seal 134 Double supporting ring 135 Spacer 136 Oiler 138 O ring 168 O ring 169 Locking screw 180 Hose nozzle for inert gas inlet 169 180 122 132 133 135 126 128...

Page 9: ...in final vacuum operations In non stop operations check operating fluid daily otherwise whenever the pump is switched on 4 1 2 Operating Fluid F5 Only the synthetic operating fluid F5 may be used for...

Page 10: ...ushing gas connection It has a sliding sleeve which opens the valve when pushed towards the pump and shuts the valve when pushed away from the pump Fig 8 The dosing device is closed when the groove in...

Page 11: ...FEIFFER Service Oil leaking from the foot of the pump Radial shaft seal defective Request repair by PFEIFFER Service Pump doesn t start Ambient temperature 12 C Warm up pump Dirty pump stages Request...

Page 12: ...lowing precautions Always ensure the pump cannot be switched on when carrying out any work on the pump If necessary remove the pump from the system to carry out inspection work Only dismantle the pump...

Page 13: ...O ring 34 Cover 47 Valve spindle 48 O ring 49 O ring 50 Valve housing 51 Plate spring 52 Screw 53 O ring 54 Screw 55 Insert 56 Screw 57 O ring 58 Centering sleeve 59 Hole 60 O ring 61 Sleeve 62 Flush...

Page 14: ...dosing valve unit 64 Remove insert 70 Four borings have been provided on the front side for this operation Clean all parts Check O rings 65 and 69 for wear and replace if necessary Lightly oil O rings...

Page 15: ...time is kept to a minimum Have the pump repaired on the spot by our PFEIFFER Service Engineers Return the individual components to the manufacturer for repairs Replace individual components with a new...

Page 16: ...3360 2150 Noise development without gas ballast dB A 60 60 Operating fluid amount l 17 13 Max admissible operating temperature 1 C 90 90 Nominal rotation speed of pump at 50 Hz 1 min 965 965 at 60 Hz...

Page 17: ...comprehensive range of accessories can be found in section B of the Pfeiffer catalogue order no PA 800 066 PE to extend the application range of the pumps and protect the pump from wear when used unde...

Page 18: ...he repair and or service of vacuum components will only be carried out if a correctly completed declaration has been submitted Non completion will result in delay The manufacturer could refuse to acce...

Page 19: ...t the product specified below is in accordance with the provision of EU Machinery Directive 98 37 EEC Annex II A EU Electromagentic Compatibility Directive 89 336 EEC and EU Low Voltage Directive 73 2...

Page 20: ...81 3 32 259 011 Email pfeiffer hakuto co jp Korea Pfeiffer Vacuum Korea Ltd 703 Ho 853 1 Hankuk Mulru Dongchonri Suzi Eup 449 843 Yong in City Kyungkido Phone 82 31 266 0741 Fax 82 31 266 0747 Email s...

Reviews: