
Mounting and commissioning the machine
26
8
.01.04
Fitting the reel stand
●
Fit the reel stand as shown in Fig.
8
-
04
.
●
Afterwards insert the stand in the hole in
the table top and secure it with nuts pro-
vided.
Fig. 8 - 04
8
.02
Commissioning
●
Clean the machine thoroughly and then check the oil level ( see Chapter
12
Care and
Maintenance
).
●
Check the machine, in particular the electric leads and pneumatic connection tubes, for
any damage.
●
Have mechanics ensure that the machine’s motor can be operated with the available
electricity supply.
●
Connect the machine to the compressed air system. The manometer should show a
pressure of
6
bar.
●
If necessary, set this value ( see Chapter
12
.
05
Checking / adjusting the air pressure
).
●
Before the machine is commissioned, the seam pattern sizes set in the machine control
unit must be checked, see Chapter
8
.
04
Setting the seam pattern size
.
8
.03
Switching the machine on / off
●
Switch the machine on or off ( see Chapter
7
.
01
Main switch
).
Summary of Contents for 3307-1 Series
Page 124: ...124 Circuit diagram View Version 13 11 06 91 191 511 95 Part 1...
Page 125: ...125 91 191 511 95 Part 2 Version 13 11 06 Circuit diagram View...
Page 126: ...126 Circuit diagram View Version 13 11 06 91 191 511 95 Part 3...
Page 127: ...127 91 191 511 95 Part 4 Version 13 11 06 Circuit diagram View...
Page 128: ...128 Circuit diagram View Version 13 11 06 91 191 511 95 Part 5...
Page 129: ...Note...