16
4.5 Adding Refrigerant after Long-Term
System Operation
Procedure
1)
Connect the charge hose to the 3-way service
port and open the 2-way and 3-way valve.
Connect the charge hose to the valve at the
bottom of the cylinder. If the refrigerant is R410A,
place the cylinder bottom-up to ensure liquid
charge.
2). Purge the air from the charge hose.
Open the valve at the bottom of the cylinder and
press the check valve on the charge set to purge
the air (be careful of the liquid refrigerant).
3) Place the charging cylinder onto the electronic
scale and record the weight.
4) Turn on the air conditioner in cooling mode.
5) Open the valves (Low side)on the charge set and
charge the system with liquid refrigerant.
6).When the electronic scale displays the proper
weight (refer to the gauge and the pressure of the
low side), disconnect the charge hose from the 3-
way valve’s service port immediately and turn off
the air conditioner before disconnecting the hose.
7). Mount the valve stem caps and the service port.
Use torque wrench to tighten the service port cap
to a torque of 18N.m(13.27 ft·lbs).
Be sure to check for gas leaks.
4.6 Procedure when servicing the indoor
unit refrigeration circuit.
1. Collecting the refrigerant into the outdoor
unit
Procedure
1). Confirm that both the 2-way and 3-way valves
are set to the opened position
Remove the valve stem caps and confirm that the
valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the
valve stems.
2). Connect the charge hose with the push pin of
handle lo to the 3-way valves gas service port.
3). Air purging of the charge hose.
Open the handle Lo valve of the manifold valve
slightly to purge air from the charge hose for 5
seconds and then close it quickly.
4). Set t
e 2-way valve to the close position.
5). Operate the air conditioner at the cooling cycle
and stop it when the gauge indicates 0.1MPa.
6). Set the 3-way valve to the closed position
immediately
Do this quickly so that the gauge ends up indicating
0.3 to 0.5Mpa.
Disconnect the charge set, and tighten the 2-way
and 3-
way valve’s stem nuts.
Use a torque wrench to tighten the 3-way valves
service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
2. Air purging with vacuum pump
Summary of Contents for 3PAMS18-HH-MZO2
Page 5: ...4 ...
Page 29: ...28 3PAMSH18 MZO2 5 ...
Page 30: ...29 6 2 Wiring diagram of 1 drive 3 outdoor M3OF 27HFN1 M ...
Page 31: ...30 3PAMSH27 MZO3 3PAMS27 HH MZO3 ...
Page 32: ...31 M3OH 27HFN1 M ...
Page 33: ...32 6 3 Wiring diagram of 1 drive 4 outdoor M4OF 36HFN1 M ...
Page 34: ...33 M4OH 36HFN1 M 3PAMSH36 MZO4 ...
Page 36: ...35 6 4 Wiring diagram of 1 drive 5 outdoor M5OF 48HFN1 M ...
Page 47: ...46 PCB board of M5OF 48HFN1 M M4OH 36HFN1 M ...
Page 51: ...50 PCB Board of 3PAMS48 HH MZO5 3PAMS36 HH MZO4 3PAMSH48 MZO5 ...
Page 53: ...52 IPM board of 3PAMS48 HH MZO5 3PAMS36 HH MZO4 3PAMSH48 MZO5 ...
Page 72: ...71 Operating els Standby Pic 2 IPM for 2 zone 3 zone ...
Page 91: ...90 Operating els Standby Pic 2 IPM board for 2 zone 3 zone ...
Page 93: ...92 PIC 4 Check point button press 1 time for check how many indoor units are connected ...
Page 99: ...98 IPM board for 4 zone ...
Page 103: ...102 Two ports of the inductance Inductance ...
Page 106: ...105 Vs Vcc Vsp FG ...
Page 110: ...109 ...
Page 113: ...112 ...
Page 116: ...115 ...
Page 120: ...119 Faulty outdoor PCB Trouble shooting ...
Page 129: ...128 ...
Page 136: ...135 Red Blue Red Yellow Brown Orange ...
Page 137: ...136 Brown White ...