15
1. Air Purging Using the Vacuum Pump
1. Completely tighten the flare nuts on the
indoor and outdoor units. Confirm that both
the2-way and 3-way valves are set to the
closed position.
2. Connect the charge hose with the push pin of
the Handle Lo to the 3-way valve gas service
port.
3. Connect the charge hose of the Handle Hi to
the vacuum pump.
4. Fully open the Handle Lo of the manifold
valve.
5. Turn on the vacuum pump to begin
evacuation.
6. Conduct a 30-minute evacuation. Check
whether the compound meter indicates -
0.1Mpa(14.5Psi). If the meter does not
indicate -0.1Mpa(14.5Psi) after 30 minutes
has elapsed, continue evacuation for 20 more
minutes. If the pressure does not reach -
0.1Mpa(14.5Psi)
after
50
minutes
has
elapsed, check if there are any leaks.
Fully close the Handle Lo valve of the manifold
valve and turn off the vacuum pump. After 5
minutes, confirm that the gauge needle is not
moving.
7. Turn the flare nut on the 3-way valve45°
counterclockwise for 6-7 seconds. Once gas
begins to come out, tighten the flare nut.
Make sure the pressure display on the
pressure indicator is higher than atmospheric
pressure. Then remove the charge hose from
the 3-way valve.
8. Fully open the 2-wayand 3-way valves and
securely tighten the cap on the 3-way valve.
2.
Adding refrigerant if the pipe length
exceeds chargeless pipe length
Procedure:
1)
Connect the charge hose to the charging cylinder
and open the 2-way and 3-way valves.
With the charge hose you disconnected from the
vacuum pump, connect it to the valve at the
bottom of the cylinder.
If the refrigerant is R410A, place the cylinder
bottom-up to ensure liquid charging is possible.
2). Purge the air from the charge hose.
Open the valve at the bottom of the cylinder and
press the check valve on the charge set (be
careful of the liquid refrigerant).
3) Place the charging cylinder onto the electronic
scale and record the weight.
4) Turn on the air conditioner in cooling mode.
5) Open the valves (Low side) on the charge set.
Charge the system with liquid refrigerant.
6).When the electronic scale displays the proper
weight (refer to the table), disconnect the charge
hose from the 3-
way valve’s service port
immediately and turn off the air conditioner before
disconnecting the hose.
7). Mount the valve stem caps and the service port
Use a torque wrench to tighten the service port
cap to a torque of 18N.m(13.27 ft·lbs).
Be sure to check for gas leaks.
Summary of Contents for 3PAMS18-HH-MZO2
Page 5: ...4 ...
Page 29: ...28 3PAMSH18 MZO2 5 ...
Page 30: ...29 6 2 Wiring diagram of 1 drive 3 outdoor M3OF 27HFN1 M ...
Page 31: ...30 3PAMSH27 MZO3 3PAMS27 HH MZO3 ...
Page 32: ...31 M3OH 27HFN1 M ...
Page 33: ...32 6 3 Wiring diagram of 1 drive 4 outdoor M4OF 36HFN1 M ...
Page 34: ...33 M4OH 36HFN1 M 3PAMSH36 MZO4 ...
Page 36: ...35 6 4 Wiring diagram of 1 drive 5 outdoor M5OF 48HFN1 M ...
Page 47: ...46 PCB board of M5OF 48HFN1 M M4OH 36HFN1 M ...
Page 51: ...50 PCB Board of 3PAMS48 HH MZO5 3PAMS36 HH MZO4 3PAMSH48 MZO5 ...
Page 53: ...52 IPM board of 3PAMS48 HH MZO5 3PAMS36 HH MZO4 3PAMSH48 MZO5 ...
Page 72: ...71 Operating els Standby Pic 2 IPM for 2 zone 3 zone ...
Page 91: ...90 Operating els Standby Pic 2 IPM board for 2 zone 3 zone ...
Page 93: ...92 PIC 4 Check point button press 1 time for check how many indoor units are connected ...
Page 99: ...98 IPM board for 4 zone ...
Page 103: ...102 Two ports of the inductance Inductance ...
Page 106: ...105 Vs Vcc Vsp FG ...
Page 110: ...109 ...
Page 113: ...112 ...
Page 116: ...115 ...
Page 120: ...119 Faulty outdoor PCB Trouble shooting ...
Page 129: ...128 ...
Page 136: ...135 Red Blue Red Yellow Brown Orange ...
Page 137: ...136 Brown White ...