Operation manual
14
surface. The sticker corresponds to Fig.4. To get access to it, remove the turnstile cover (3). Undo
two M6 nuts, fixing the upper parts of the left-side outer panel (2). Lift the outer panel and take it off
carefully.
The outer panel and the turnstile cover mounting is carried out in the reverse order.
The turnstile in the delivery set (see Clause 4.1) is packed in two boxes, which keep it undamaged
during the transportation and storage.
Box 1(for packaging of the turnstile housing) overall dimensions ........................... 122×38×112 cm
Box 2 (for packaging of the turnstile cover) overall dimensions ................................ 114×35×13 cm
Weight (gross) .................................................................................................. no more than 89 kg
7 SAFETY REQUIREMENTS
7.1 Installation safety requirements
The installation should be only carried out by the qualified personnel after the careful study of this
Manual.
Caution!
•
All the cables
should be connected up when the power supply is switched off from the AC
mains.
•
Use only the serviceable tools for installation.
•
Observe general electrical safety rules when laying out the cables.
See certificates of the power supply units for the safety requirements to those power supply units.
7.2 Operation safety requirements
Observe general electrical safety rules when operating the turnstile.
Do not use!
•
Do not use the turnstile under conditions that do not comply with the requirements of
Chapter 2 of this Manual.
•
Do not use the turnstile at supply voltage that does not comply with the requirements of
Chapter 3 of this Manual.
See certificates of the power supply units for the safety requirements to those power supply units.
8 INSTALLATION INSTRUCTIONS
8.1 Installation details
It is recommended:
•
to mount the turnstile on steady and level concrete (grade 400 or higher, strength group V22.5),
stone or similar foundations at least 150mm thick;
•
to level the foundation so that the anchoring points of the turnstile lie in the same plane (to be
verified with a builder’s level);
•
to apply reinforcing elements (400×400×400 mm) for installation on less steady foundation;
•
to organize the passage zone according Fig. 9;
•
to mark the mounting holes according to Fig. 10;
•
to control the vertical position of the turnstile during installation with a plumb line;
•
to carry out installation by means of not less than two people which possess qualifications of
skilled electrician and installer.
Note:
When creating the passage area through the turnstile take into account
that the resetting device operates as follows:
- at the barrier arm turning at the angle of more than 60° the reset to home position is
effected in the direction of movement;
- at the barrier arm turning at the angle less than 60° the reset to home position is effected
in the counter to the movement direction (reset to home position)