2
016-
10
32
PROFIBUS Power Hub Segment Coupler 3 (SK3)
PROFIBUS Commissioning
The
Create new device
catalog window appears:
4. Confirm with
Yes
.
The DTM is installed and ready for operation.
Creating the Project Tree
In order to create the project tree, proceed as follows:
1. Start PACTware
TM
.
Note: Make sure the latest DTM version is installed and that the device catalog is updated.
2. Open the appropriate project or create a new one.
3. Open the Device catalog:
View > Device Catalog
. Alternatively, press <F3>.
4. Open the menu entry
Softing AG
.
5. Select the entry
Drivers > PROFIBUS Driver
.
6. Drag and drop the
PROFIBUS Driver
to your project window below
Host PC
.
7. In the Device catalog, open menu item
Fuchs GmbH > Device > HD2-GTR-4PA
.