Model 1011
Installation and Operation Manual
18
Par
t No
. 51
2083 Dra
wing No
. 1
29-0205a 03/09
System Maintenance
Regular Maintenance
Drain the protection system regulator frequently and clean system with nonsolvent cleaning agents only.
Long-Term Maintenance
Calibrate the enclosure pressure indicator to 0 inches by venting the purge pressure reference port and the protected enclosure to
atmosphere and adjusting the calibration screw in the lower center portion of the indicator’s face.
Fully open the enclosure pressure control regulator, to blow out any deposits around the tip of the valve and to ensure that the
enclosure protection vent is operating properly, then carefully readjust system according to the set-up procedure and operating
sequence on pages 14 and 15. Replace or tighten stem packing nut as required to prohibit stem packing leakage.
Carefully disassemble the enclosure protection vent by loosening the two bottom hex nuts that hold the unit together.
(DO NOT REMOVE CAP NUTS ON TOP OF VENT BODY)
Carefully clean the flapper valve and vent body seats with warm soap and water, being careful not to extend the vent valve beyond
its normal opening point, and being careful not to exert any stress on the valve hinge.
Examine the entire protection system and the protected enclosure(s), and replace any defective parts during routine shutdown of
the protected enclosure(s). Parts are available from Fuchs on immediate notice as required.
MAINTENANCE SCHEDULE
Date
Work performed
Performed by