background image

19

The external devices are comprised of:
- pressure pickup operating the pump (pressure switch or electronic sensor)
- pressure pickup for low pressure alarm (pressure bulb - autotest units)
- level detector (probes, floats, minimum pressure switch)
- acoustic alarm (electronic siren - autotest units)
- solenoid valve (for autotest units)

1) float switch

The float must be installed in the tank and connected thanks to two wires to the special terminals on the control board.

2) electronic control with probes

The three probes should be specially placed in the first collection deposit and should be then connected to terminals
inside the board. The COMMON probe must be installed at the lowest level in the tank and anyway always at a level
lower than the minimum level probe (

LOW

) that prevents from the working of the pilot pump when water descends

below this level. The maximum level probe (

HIGH

) allows again the working of the pilot pump when the water reaches

this level.

3) Inverted minimal pressure sensor

In the case where the group is fed by a water duct under pressure (for example municipal water system), it is
necessary to install a minimal pressure sensor which prevents from the working of the group if the pressure in the
duct descends below the preset value.

Chap.6 – Starting up

See fig.3-4-5-6-7-8 and diagrams in the distribution board.

Control of the direction of rotation of the pump with inverter drive.

Once all the hydraulic and electric connections have been done for the hydraulic priming of the pumps and collectors,
proceed as follows:
- close all the valves of the distribution system
- open all the valves of the group, included those of the membrane ways
- control the closing of the distribution board hatch
- place the power supply disconnector on I (ON)

DANGER

Risk of electrical

discharge

Warning: from this moment any operations on pump ducts, pressure
transducer, pressure sensor, etc. must be done after having cut the
voltage off from the distribution board.

Press  key  (11)

to enable MANUAL operation unit

M

A

GB

WARNING

Before connecting the power supply cable to the control board, check
that it has sufficient dimensions to support the maximum voltage
required by group pumps.

WARNING

The connection of the distribution boards to the power grid must be done
according to indications reported on the electric connection scheme
situated in the control board.

The substitution of electric and electronic components must to be done
by a skilled staff.

DANGER

Risk of electrical
discharge

WARNING

Our units are equipped with all the devices necessary for their
respective operations except for that of level control which must be
chosen and mounted during assembly

Protection against dry operation of the motor pumps (refer to fig. 4)

On the switchboard it is possible to connect to a device for tank level control 

(our units are delivered with 26-27-

28 jump terminals)

WARNING

In this case the unit is not protected against dry operation. It is therefore
necessary to remove the electric bridges and connect them to the
control device selected

Summary of Contents for Nocchi Pressomat

Page 1: ...gs und Wartungsanleitung E Manual de uso y manutenci n NL Handleiding voor gebruik en onderhound PL Recyzny uzywaine i obslugi RUS Bycnherwbb gj ecnfyjdrt b Bycnherwbb gj ecnfyjdrt b Bycnherwbb gj ecn...

Page 2: ...i direktivene gjengitt nedenfor EU VAATIMUSTENMUKAISUUSVAKUUTUS Yhti Pentair International Sarl ilmoittaa omalla vastuullaan ett alla osoitetut tuotteet ovat oleellisten turvallisuus ja terveydensuoj...

Page 3: ...ely the retailer In case of claims contact immediately the retailer within eight days of purchase Chap 2 Limits of use Our pressurization groups are constructed for the raising clean water without sol...

Page 4: ...t pressure in the installation or with the tanks disassembled Chap 4 Priming of the group DANGER Risk of electrical discharge Always shut off the voltage before proceeding to any operation WARNING the...

Page 5: ...Once all the hydraulic and electric connections have been done for the hydraulic priming of the pumps and collectors proceed as follows close all the valves of the distribution system open all the va...

Page 6: ...to 0 OFF From then on the unit will automatically work according to the quantity of water withdrawn by its use Change of the working pressure setup Our units are set and tested during manufacture and...

Page 7: ...small collector by bringing the pressure to the level start pump that we want to assign to pressure switch n 1 tighten screw B of pressure switch n 1 to the point where its electric contact closes ON...

Page 8: ...ped WARNING The calibration values of the pressure switch must be between the minimum and maximum working pressure levels foreseen for the pump used in the unit and reported in the plate applied to th...

Page 9: ...NO Line n 1 COMPRESSOR With keys 16 or 17 it is possible to set the parameter YES or NO YES means that the unit has a pump and an air compressor operated by the same switchboard In this example NO Li...

Page 10: ...essage will appear ENTER TIMING PUMPSN 3s 060 Line n 1 Timing Noparameter Line n 2 PUMPS N 3 s With keys 16 or 17 it is possible to set the parameter to any value between 0 and 255 seconds This indica...

Page 11: ...ollowing message will be displayed In this case both the green led 2 and the red led 5 are lit BEFORETHEBUZZEREMITSTHE8th EIGHTH RING Press key 11 for a few seconds The following message will be displ...

Page 12: ...ted by the same switchboard In the example NO Line n 2 no message After choosing the parameter press key 18 the following message will appear ENTER DELAY FC S 40 ACTIVATION FC s X60 Line n 1 DELAY FC...

Page 13: ...pump will be stopped XXX seconds after having reached the maximum pressure set In the case of this example it is for 40 seconds After choosing the parameter press key 18 the following message will app...

Page 14: ...isplayed M A MANUALE FUNCTION BAR 5 3 The buzzer automatically sounds off and the red led 5 remains turned on Press key 18 for 2 seconds and the following message will be displayed LINEA MAN MAN ENTER...

Page 15: ...r 17 set the number in tens of minimum pressure values for the second pump normally 0 Confirm by pressing key 18 The cursor will change position depending on the number of units involved With keys 16...

Page 16: ...BARs normally 0 3 to 1 0 lower than the value assigned to pump 3 Line n 2 MIN0X XS With keys 16 or 17 set the number in tens of minimum pressure value of the fourth pump normally 0 Confirm by pressin...

Page 17: ...mechanic seal etc it is advisable to provide the machine with devices for the periodic starting of the pump and for the signaling of possible damages These additionally have the followings devices 1 w...

Page 18: ...ch on I ON Replace the disconnected fuses Press the AUT switch Restore the water level GB Theconnectingtubeofthepressure switches are obstructed The pressure switches cable is by passed The push selec...

Page 19: ...129 Fig 2 a...

Page 20: ...130 I Fig 2 b...

Page 21: ...131 Fig 3...

Page 22: ...132 Fig 5...

Page 23: ...133 Fig 4 Fig 6 Fig 7 Fig 8 Fig 9...

Page 24: ...134 Fig 10...

Page 25: ...s t correctement effectu s Si la panne est due des causes de force majeure ou d autres facteurs externes et incontr lables Si le produit est utilis avec des liquides abrasifs ou corrosifs ou diff rent...

Page 26: ...elni a k vetkez iratokat v s rl st igazol sz mla r szletes hibabejelent Niniejsze urz dzenie obj te jest gwarancj prawn zgodnie z przepisami i normami obowi zuj cymi w danym pa stwie w dniu zakupu pok...

Page 27: ...253P8800 PENTAIR INTERNATIONAL S a r l Avenue de Sevelin 18 1004 LAUSANNE Switzerland...

Reviews: