![Penlon Prima 320 Advance User Manual Download Page 46](http://html1.mh-extra.com/html/penlon/prima-320-advance/prima-320-advance_user-manual_1523898046.webp)
Prima 320 Advance
40
User Manual
Installation and Pre-Use Checks
5. Set the Bag/Vent switch to Bag.
6. Make sure that the manual bag is connected to the bag
port.
7. Turn off all vaporizers.
8. Turn the APL valve control counterclockwise to the MIN
position.
9. Set all gas flows to a minimum.
10. Make sure that the breathing system is not damaged and
correctly connected.
11. Before connecting a patient, flush the machine with 5 L/
min of O2 for at least one minute. This removes unwanted
gas mixtures from the system.
12. Set the anaesthesia system switch to the OFF position.