CHARGING STATION PELLENC CHARGING STATION
56_136922-B
5. Remove the pre-assembled bolts and washers.
6. Separate the pre-assembled bolts and washers, then insert the studs into the 4 holes using a hammer, until
they are flush.
7. Screw the 2 bolts with the 2 washers into the top brackets.
8. Tighten to the recommended torque depending on the model chosen (6 Nm for the RS PRO brand / 6.5 Nm
for the RAWL FIXINGS brand).
9. Unscrew the 2 bolts to leave a gap of 5mm between the washers and the wall so that the panel of the charging
station cabinet fits between the washers and the wall.
10. Using appropriate handling equipment, lift the charging station,
11. and place it on the studs,
12. tighten the bolts to the recommended torque depending on the model chosen (6 Nm for that of RS PRO brand /
6.5 Nm for that of RAWL FIXINGS brand).
13. Screw the 2 bolts and washers into the bottom fixings through the holes in the charging station cabinet, and
tighten them to the torque recommended for the chosen model (6 Nm for the RS PRO brand / 6.5 Nm for the
RAWL FIXINGS brand).
4.1.2. INSTALLATION OF CHARGING STATION ON A WORK SURFACE
Warning
To ensure proper stability, it is essential that the Charging station is correctly positioned. The
cabinet must be placed onto a work surface and rest against a wall.
The work plan must be carefully considered. It must be stable, dimensioned and designed to
support the weight of the Charging station and made of a fire-resistant material.
1. The two upper drill holes are used to fix the cabinet to the wall. Drill 2 holes with a diameter of 12 mm and a
length of 55 mm, at the positions specified above.
For this, use bolts and screws (not supplied) to suit the type of supporting surface.
15