CHARGING STATION PELLENC CHARGING STATION
56_136922-B
3. Unscrew the locknut on the blanking plate (15) to
release the left hand outlet from the cabinet.
4. Unscrew the locknut of the cable grommet (16).
5. Remove the power cable (6) from the right hand out-
let of the cabinet.
6. Pass the power cable (6) through the left hand outlet
of the cabinet.
7. Hold the power cable in place with the cable grom-
met and the locknut, and tighten it (8Nm).
8. Torque tighten (8Nm).
9. Close off the right hand outlet with the blanking plate
and locknut.
10. Install the metal wall at the bottom of the cabinet.
11. Fit the 3 screws.
Warning
Take care not to damage the cables or components in the space behind the vertical plate while
you are working.
When connecting to the customer's power supply unit, observe the standard colour code:
• Brown = phase
• Blue = neutral
• Green/yellow = earth
17