10
H. Install powerside platform.
1. Put the powerside platform upon the cross beams by fork lift or manual, offset the
cross beams to the outside till the pulleys of both platforms can set up into the cross
beams
(See Fig.18)
, Install the powerside platform and screw up the bolts
(See
Fig.19)
.
Fig. 19
15
16
17
Install the powerside platform
and screw up the bolts
Pulley installation
Offset the cross beam lean
outward when putting the
powerside platform on the
cross beams
Offset the cross beam
lean outward when
putting the powerside
platform on the cross
beams
Fig. 18
8
Summary of Contents for AMGO 409
Page 1: ...0 FOUR POST LIFT Model 409 A440...
Page 9: ...7 D Install cross beams See Fig 11 Fig 12 3 1 3 Fig 12 Hole towards inside 2 Fig 11...
Page 33: ...31 IV EXPLODED VIEW Model 409 A440 Fig 46 13...
Page 34: ...32 CROSS BEAM CYLINDERS Fig 47 Fig 48 3...
Page 35: ...33 CONTROL BOX SPX ELECTRIC POWER UNIT 220V 5HZ single phase Fig 50 Fig 49 Fig 50...
Page 50: ...8 72114202 12 2015...