2
II. INSTALLATION REQUIREMENT
A.
TOOLS REQUIRED
ü
Rotary Hammer Drill (
Φ
19)
ü
Hammer
ü
Level Bar
ü
English Spanner (12")
ü
Ratchet Spanner With Socket (28
#
)
P
Wrench Set
ü
Carpenter’s Chalk
ü
Screw Sets
ü
Tape Measure (7.5m)
ü
Pliers
ü
Socket Head Wrench (3
#
, 5
#
, 6
#
)
P
Lock Wrench
(10
#
, 12
#
, 13
#
, 14
#
, 17
#
, 19
#
, 24
#
, 30
#
)
Fig. 2
Summary of Contents for AMGO 409
Page 1: ...0 FOUR POST LIFT Model 409 A440...
Page 9: ...7 D Install cross beams See Fig 11 Fig 12 3 1 3 Fig 12 Hole towards inside 2 Fig 11...
Page 33: ...31 IV EXPLODED VIEW Model 409 A440 Fig 46 13...
Page 34: ...32 CROSS BEAM CYLINDERS Fig 47 Fig 48 3...
Page 35: ...33 CONTROL BOX SPX ELECTRIC POWER UNIT 220V 5HZ single phase Fig 50 Fig 49 Fig 50...
Page 50: ...8 72114202 12 2015...