36
3-5 mm
V. TEST RUN:
1. Fill the reservoir with approximately 12L Hydraulic Oil (Note: In consideration of
Power Unit’s durability
,
please use Hydraulic Oil 46#).
2.
Press button , the Cables will be strained. Check whether the Cables match
the Pulley. Make sure the Cables are not across.
3.
Press self-lock button , the Cross-beam will be locked to the safety ladders,
and then adjust the platforms to be level by adjusting the nuts of Safety Ladders.
4.
Adjust the cable fitting Hex nuts to make platforms and four safety locks work
synchronously. You need to run the lift up and down for several times, meanwhile do
the synchronous adjustment till the four Safety Devices can lock and release at the
same time.
5.
Adjust the clearance between the post and the plastic slider of Cross-beam to about
2 mm, and then tighten the fixing nut of slider.
6.
Adjust Limit Switch on Cross Beam:
6.1 Press button , the Cables will be strained. Check whether the distance
between lever of Limit Switch on Cross Beam and the Slack-cable safety lock is
about 5 mm. If not, please adjust the distance correctly
(See Fig. 55)
.
6.2 Press self-lock button , the Cross-beam will be locked to the safety
ladders, and the cables are released, Check whether lever of Limit Switch on Cross
Beam touch the Slack-cable safety lock and whether Limit Switch is open
completely. If not be opened, then adjust the lever of limit switch till the
Slack-cable safety lock can completely open the switch
(See Fig. 56)
.
Tighten cable
Fig. 55
Release cable
Fig. 56
Safety lock 2
Limit Switch
Summary of Contents for AMGO 409
Page 1: ...0 FOUR POST LIFT Model 409 A440...
Page 9: ...7 D Install cross beams See Fig 11 Fig 12 3 1 3 Fig 12 Hole towards inside 2 Fig 11...
Page 33: ...31 IV EXPLODED VIEW Model 409 A440 Fig 46 13...
Page 34: ...32 CROSS BEAM CYLINDERS Fig 47 Fig 48 3...
Page 35: ...33 CONTROL BOX SPX ELECTRIC POWER UNIT 220V 5HZ single phase Fig 50 Fig 49 Fig 50...
Page 50: ...8 72114202 12 2015...