background image

Page 14

WARNING

Electrical Connection

Connect the generator to an appropriate 100-230 volt single-phase supply, refer to 

the generator serial plate for input specification and ensure your supply matches the 

requirements.

If the appropriate power cord is not supplied; a new plug, rated to at least 12 amps, can 

be fitted by a qualified electrician. If a substitute mains supply cord is used, ensure that 

it has an adequate rating. Failure to do so could cause damage to the generator.

This unit is classified as SAFETY CLASS 1. THIS UNIT MUST BE 

EARTHED. Before connecting the unit to the mains supply, please 

check that your electrical supply falls within the specified range, see 

below.

EARTH/GROUND (E):-   

Green & Yellow   or 

Green

LIVE (L):-   

 

 

Brown 

          or 

Black

Neutral (N):- 

 

 

Blue             

or 

White

Electrical requirements are 100-230VAC n/- 10% depending on chosen model. 

However, running continuously at voltages outside this is not recommended. Extended 

periods at extremes can have a detrimental effect on the operation and life of the 

generator.

If the equipment is used in a manner not specified by the manufacturer, 

the protection provided by the equipment maybe impaired.

Unit is fully pneumatic and can function without electricity.

If the unit is not connected to a power supply the pressure status indicator feature 

will not be available and the LED lights will not function. The unit will perform all 

other functions.

WARNING

Summary of Contents for Solaris XE

Page 1: ...Solaris XE User Manual Copyright Peak Scientific Instruments Ltd 2020 Solaris XE User Manual Rev 5 RSID 2302 EN 21 07 2020...

Page 2: ...Kit Contents 10 Unpacking Instructions 10 Installation 11 Generator Environment 11 Generator Overview 12 Solaris XE General Dimensions 12 Solaris XE Rear Connections 13 Electrical Connection 14 Air P...

Page 3: ...ntended for end users and has been written as a reference document where you can skip to the relevant information Users can refer to the contents page to find the relevant information Please review ea...

Page 4: ...ality of the foregoing that any defect is not the direct or indirect result of lack of repair and or servicing incorrect repair and or servicing use of wrong materials and or incorrect spare parts 2 A...

Page 5: ...ted conditions are fully understood or met A CAUTION notice denotes a hazard It calls attention to an operating procedure process or similar which if not correctly performed or adhered to could cause...

Page 6: ...10 Electrical Equipment for measurement control and laboratory use Electromagnetic Compatibility Directive 2014 30 EU EN 61326 1 2013 Electrical Equipment for measurement control and laboratory use FC...

Page 7: ...onfirm that as a manufacturer of articles we conform to the European Parliament and Council Directives 2011 65 EU for the original 6 restricted substances listed in the Restriction of Hazardous Substa...

Page 8: ...Flow For Max Outlet Flow up to 100 L min Minimum Air Inlet Quality ISO 8573 1 2010 Class 1 4 1 Generator Outlets Maximum Output Pressure 116 psi 7 99 bar variable Maximum Outlet Flow Rate up to 35 L m...

Page 9: ...k Partner from where the unit was purchased Follow the unpacking instructions posted on the side of the crate It will require two people to remove the unit from the shipping crate and to manoeuvre the...

Page 10: ...Key x 1 10 No 8 Wall Plug x 4 11 No 8 Screw x 4 All of the generators output ports are located on the rear panel of the unit Unpacking Instructions The unit weight constitutes a two person lift and a...

Page 11: ...ths of pipe runs as pressure drops can result from extended runs of pipe The performance of the generator like all sophisticated equipment is affected by ambient conditions Note should also be taken t...

Page 12: ...Page 12 Generator Overview Solaris XE General Dimensions Horizontal postioning on wall 343 mm 13 50 655 mm 25 78 156 mm 6 14...

Page 13: ...ts are connected to correct application Connections should only be carried out by trained personnel The Generator should be switched off prior to maintenance and cleaning Power Switch Power Inlet Nitr...

Page 14: ...se check that your electrical supply falls within the specified range see below EARTH GROUND E Green Yellow or Green LIVE L Brown or Black Neutral N Blue or White Electrical requirements are 100 230VA...

Page 15: ...tion to ensure correct tubing is being used Once the tubing is connected to the application please ensure that it is thoroughly checked for being leak tight Even the slightest leak in the gas supply b...

Page 16: ...ive an indication of internal pressure in the system The LED s on the front panel will illuminate YELLOW Turn the air supply on The fascia will illuminate GREEN when adequate system pressure has reach...

Page 17: ...the regulator at the front of the generator and viewed on the adjacent gauge To access the regulator unclip the fascia from the unit Adjust the gauge to the required pressure To ensure a smooth press...

Page 18: ...uirements Service Schedule Purchase Interval Component Visit Qty 12 months Solaris Nitrogen XE Annual Maintenance Kit www peakscientific com ordering 1 Please note Only Peak Scientific approved compon...

Page 19: ...to install and setup your generator IQ OQ Certified assurance for applications requiring documented qualification Complete plan Swift response by a Peak Service Engineer within 72 hours planned preve...

Page 20: ...e cloth prior to use Cleaning should only be undertaken with the power switched off and the power cord removed from the rear of the generator Under no circumstances should any solvents or abrasive cle...

Page 21: ...rd plug Contact your service provider The fascia LED s have not illuminated but the power switch is illuminated Contact your service provider The fascia Yellow illumination does not change to green Ch...

Page 22: ...ic com For generators that remain unregistered after 1 month from the shipment date the warranty will be considered active from the date of factory dispatch Complete Plan only Go Online or Complete an...

Page 23: ...Page 23...

Page 24: ...ponse service to our customers With Peak Protected your laboratory s productivity becomes our top priority To discuss Peak Protected generator cover and payment options speak to your local Peak Repres...

Reviews: