Page 16
Start-Up Sequence
Connect the generator to the application as described in the installation guide. Switch
the generator on using the power switch on the rear panel of the unit and connect
to the air supply. Please note: Air can flow through the generator without the power
switched on, however the power must be switched on to give an indication of internal
pressure in the system.
The LED’s on the front panel will illuminate
YELLOW
.
Turn the air supply on. The fascia will illuminate
GREEN
when adequate system pressure
has reached 80psi. The Generator will provide Nitrogen almost instantaneously.
The Generator will illuminate
YELLOW
if adequate internal pressure is not met or is lost
during operation. If the unit displays
YELLOW
during operation, disconnect the unit
from your appliance and check the input air supply to the generator.
YELLOW
YELLOW
GREEN
GREEN
Summary of Contents for Solaris XE
Page 23: ...Page 23...