page 9
Single-point adjustment with 50% humidity standard
For the adjustment the appropriate calibration equipment as well as
calibration ampoules resp. humidity standards of 50 % r.h. are required.
Proceedings
Preparation
To ensure as good as possible inspection results it is essential that the
measuring device, the calibration equipment and the calibration ampoules
have approximately the same temperature.
This temperature has to be between 20°C and 26°C.
The best way to ensure the same temperature of the different components is
to store all components together in a room with only small temperature
fluctuations minimum over night – better for 24 hours.
Components of calibration equipment
In this image you can see the components of the
calibration equipment and a calibration ampoule
with humidity standard.
Assembly of calibration equipment
1. Put in the first gasket ring in the upper part of
the calibration device.
2. Push in the sword sensor in the upper part as shown in the picture.
3. Now put the second gasket ring into the upper part.
4. Lay in the textile pad in the bottom part of the calibration device, and
pour the humidity standard carefully at the textile pad.
Summary of Contents for RH5
Page 14: ...page 14 Notes...