PCE Instruments PCE-CS 1000 N Manual Download Page 5

 

OPERATING INSTRUCTIONS 

 

Servicing and examination

 

 

Checks to be made before the use of the measuring equipment 

The  equipment  must  be  checked  before  the  beginning  of  every  workday.  .  In  the  course  of  the 
examination, the operator must ensure that, 

-

 

no deformations or other damages for example cracks are visible 

-

 

all the attachment parts are present and in good order and condition (for example safety splints 
etc.). 

-

 

the present complete system does not conceal any hazards (for example an incorrect assembly). 

-

 

there are no potential hazards within the vicinity of the operating area and if so the must be dealt 
with or rendered safe before operating the equipment. 

 
Regular inspection / Servicing 

 
After 

every 

months 

or 

after 

12,500 

measurements, depending on which comes first.  

-

 

Check all parts for any excessive wear and 
tear. 

-

 

Check all dimensions. 

-

 

Check 

housing 

for 

any 

signs 

of 

deformation or damage. 

-

 

Check  all  parts  and  ensure  they  are 
functioning correctly. 

After 

every 

12 

months 

or 

after 

50,000 

measurements, depending on which comes first. 

-

 

Check  all  load-bearing  parts  for  example 
hairline cracks etc. Only trained personnel 
are to carry out maintenance.  

After  every  5  years  or  25,000  measurements, 
depending on which comes first.  

-

 

All load-bearing parts must be exchanged. 

After  every  10  years  or  50,000  measurements, 
depending on which comes first. 

-

 

If  the  measuring  equipment  has  reached 
the  end  of  its  usable  life,  then  it  needs  to 
be replaced. 

 
If  property  damage  and  personal  injury  is  caused  through  incorrect  use  or  non  compliance  of  the 
regulations then the owner or the operator is responsible. The manufacturer will not be liable for damages 
caused  by  inappropriate  handling.  The  safety  guidelines  are  an  excerpt  out  of  the  applicable  standards 
and regulations, including suggestions and tips. These do not replace the valid standards and regulations, 
but are there to ensure a safe usage of the measuring equipment. You should familiarise yourself with the 
valid national safety and regulations.  
 
If you have any questions, please contact PCE Instruments UK Ltd 
 

 

Summary of Contents for PCE-CS 1000 N

Page 1: ...US 1 Tel 561 320 9162 Fax 561 320 9176 info pce americas com www pce instruments com english www pce instruments com PCE Instruments UK Ltd Units 12 13 Southpoint Business Park Ensign way Hampshire S...

Page 2: ...c switch off 10 6 2 br 3 Set background lighting 10 6 3 IdL Lighting duration 10 7 Troubleshooting 10 8 Custom settings 11 8 1 Equipment configuration 11 8 1 1 Change resolution 11 8 1 2 Automatic zer...

Page 3: ...the manufacturer and the operator adhere to certain requirements When using the measuring equipment no risk must be posed to the operator The operator or the person responsible for operating the measu...

Page 4: ...s to be allowed to be dropped or be pulled along the ground or pulled at an angle The maximum load as stipulated in the operating instructions MAX must never be exceeded this also includes the maximum...

Page 5: ...functioning correctly After every 12 months or after 50 000 measurements depending on which comes first Check all load bearing parts for example hairline cracks etc Only trained personnel are to carr...

Page 6: ...nge Tare range 100 F s Response time 1 second Safety load 150 On no account may this be exceeded Display LCD with background lighting Digit height 20 mm Ambient temperature 10 C 40 C Power supply 3 x...

Page 7: ...ontrol 1 x operating instructions 4 Equipment description 4 1 Measuring equipment 4 1 Power button 4 2 Infrared sensor 4 3 Display 4 4 Tare Zero button Display Shows the measured values Power button T...

Page 8: ...nts 4 8 Left 4 9 Setup Upwards Zero Move one value upwards Set the measuring value to zero Hold button Enter Saves the value Confirms the entry Downwards Moves one position to the right Unit change Ch...

Page 9: ...h the remote control 5 2 Zero Press the button until an acoustic signal sounds Z appears on the display The remote control can also be used to do this Press 0 Make sure the value is stable Otherwise E...

Page 10: ...ntil End appears on the display 6 3 IdL Lighting duration To set the lighting duration press three times ldl lighting duration appears on the display Press the T to set the lighting You can set it on...

Page 11: ...until End appears on the display 8 1 2 Automatic zero tolerance To set the automatic zero tolerance press twice A percent value is displayed The tolerance can be changed with the arrow buttons on the...

Page 12: ...ess until End appears on the display 8 1 9 Setting gravity To set the gravity press nine times value is displayed The value can be changed with the up and down buttons The lowest value is 0 000 and th...

Page 13: ...and for the 3 point calibration for example 1 3 2 3 or the full load The individual adjustment points can be freely set on the scale and can be adapted to the weights provided by the operator The cod...

Page 14: ...Press again LoAd2 appears on the display If this value is sufficient then switch the equipment off or press to continue Press repeatedly 00000 appears on the display The second measuring unit can be...

Page 15: ...h ElektroG R cknahme und Entsorgung von Elektro und Elektronikaltger ten our equipment can be returned We will either re use the equipment or it will be disposed of by a recycling company according to...

Reviews: