PCE Instruments PCE-CS 1000 N Manual Download Page 3

 

OPERATING INSTRUCTIONS 

 

Introduction 

The crane scale carries out internal weight checks. The crane scales power is supplied via the 3 x AA 
batteries, which have an operating time of up to 65 hours. The crane scale has a maximum load range of 
1.000kg. A hook, a shackle and a remote control are included in the delivery content. 

Safety precautions 

 

Before installing and putting this equipment into operation, please read the operating instructions 
through carefully. We are not liable for damages that occur due to non observance of the 
operating instructions. 

 

If the equipment is not used for a long period of time, then remove the batteries. 

 

In order to prevent potential hazardous situations when using this measuring equipment, it is vital 
to adhere to the safety precautions provided by the manufacturer. 

 

Do not expose the equipment to extreme temperatures

direct sunlight, extreme humidity or 

moisture 

 

Never use the measuring equipment with wet hands. 

 

It is not permitted to carry out any technical changes on the equipment. 

 

The equipment should only be cleaned with a damp cloth. Do not use abrasive cleaners or 
detergents which contain solvents. 

 

The equipment must only be used with accessories offered by PCE Germany or with 
replacements of equal value.  

 

The environmental conditions, for example the temperature ranges in which the measuring 
equipment can be used, as stipulated in the operating instructions specifications, must always be 
adhered to

Otherwise the operation of the equipment is prohibited. 

 

The measuring equipment is not to be used in an environment where there is a danger of 
explosion. 

 

Do not measure more than a ton. 

 

In  order  to  prevent  potential  hazardous  situations  when  using  heavy-lifting  equipment,  it  is vital 
the  manufacturer  and  the  operator  adhere  to  certain  requirements

.

 

When  using  the  measuring 

equipment, no risk must be posed to the operator.  

 

The  operator  or  the  person  responsible  for  operating the  measuring  equipment must  adhere  to 
the  national  regulations  for  example  health  and  safety  at  work  regulations  or  any  other 
governmental safety standards.  

 

There are also other safety precautions to be taken into consideration when operating the 
equipment, for example precautions provided by the crane, lifting device or shackle manufacturer 
etc. 

 

The  assembly,  the  commissioning  and  the  servicing  of  the  measuring  equipment  must  only  be 
carried out by properly trained personnel who have been provided with the appropriate protective 
equipment.  

 

The measuring equipment must not be altered and is only allowed to be used for the intended 
purpose. 

 

The measuring  equipment  as  well  as  any  other  equipment (for  example  the  crane  or  any  other 
heavy-lifting  equipment) must  be  regularly  serviced  and  maintained  and  where  necessary  have 
the  service  history  correctly  logged  or  certified.  Each  time  before  using  the  equipment  a  visual 
check  must  be  carried  out.  In  the  case  of  any  discrepancies  for  example  cracks,  breaks  or 
deformities,  the  equipment must  be  immediately  disabled  and  declared  unfit for  use.  This  must 
also  be  reported  where  necessary  to  the  person  in your  company  who  is  responsible for  health 
and safety. 

 

Repairs must only be carried out by trained service personnel and only approved replacement 
parts must be used when carrying out a repair. All repairs, servicing and replacement parts must 
be documented by the service department 

 

The operating instructions as well as the safety instructions must always be visible whilst using 
the measuring equipment. 

 

The  measuring  equipment  is 

not  explosion-proof

 

and  must  not  be  used  in  an  environment 

where there is a danger of explosion. The environmental conditions, for example the temperature 

Summary of Contents for PCE-CS 1000 N

Page 1: ...US 1 Tel 561 320 9162 Fax 561 320 9176 info pce americas com www pce instruments com english www pce instruments com PCE Instruments UK Ltd Units 12 13 Southpoint Business Park Ensign way Hampshire S...

Page 2: ...c switch off 10 6 2 br 3 Set background lighting 10 6 3 IdL Lighting duration 10 7 Troubleshooting 10 8 Custom settings 11 8 1 Equipment configuration 11 8 1 1 Change resolution 11 8 1 2 Automatic zer...

Page 3: ...the manufacturer and the operator adhere to certain requirements When using the measuring equipment no risk must be posed to the operator The operator or the person responsible for operating the measu...

Page 4: ...s to be allowed to be dropped or be pulled along the ground or pulled at an angle The maximum load as stipulated in the operating instructions MAX must never be exceeded this also includes the maximum...

Page 5: ...functioning correctly After every 12 months or after 50 000 measurements depending on which comes first Check all load bearing parts for example hairline cracks etc Only trained personnel are to carr...

Page 6: ...nge Tare range 100 F s Response time 1 second Safety load 150 On no account may this be exceeded Display LCD with background lighting Digit height 20 mm Ambient temperature 10 C 40 C Power supply 3 x...

Page 7: ...ontrol 1 x operating instructions 4 Equipment description 4 1 Measuring equipment 4 1 Power button 4 2 Infrared sensor 4 3 Display 4 4 Tare Zero button Display Shows the measured values Power button T...

Page 8: ...nts 4 8 Left 4 9 Setup Upwards Zero Move one value upwards Set the measuring value to zero Hold button Enter Saves the value Confirms the entry Downwards Moves one position to the right Unit change Ch...

Page 9: ...h the remote control 5 2 Zero Press the button until an acoustic signal sounds Z appears on the display The remote control can also be used to do this Press 0 Make sure the value is stable Otherwise E...

Page 10: ...ntil End appears on the display 6 3 IdL Lighting duration To set the lighting duration press three times ldl lighting duration appears on the display Press the T to set the lighting You can set it on...

Page 11: ...until End appears on the display 8 1 2 Automatic zero tolerance To set the automatic zero tolerance press twice A percent value is displayed The tolerance can be changed with the arrow buttons on the...

Page 12: ...ess until End appears on the display 8 1 9 Setting gravity To set the gravity press nine times value is displayed The value can be changed with the up and down buttons The lowest value is 0 000 and th...

Page 13: ...and for the 3 point calibration for example 1 3 2 3 or the full load The individual adjustment points can be freely set on the scale and can be adapted to the weights provided by the operator The cod...

Page 14: ...Press again LoAd2 appears on the display If this value is sufficient then switch the equipment off or press to continue Press repeatedly 00000 appears on the display The second measuring unit can be...

Page 15: ...h ElektroG R cknahme und Entsorgung von Elektro und Elektronikaltger ten our equipment can be returned We will either re use the equipment or it will be disposed of by a recycling company according to...

Reviews: