17
GAS PIPING
8. Disconnect the boiler and its individual shut-off
valve from the gas supply piping system during any
pressure testing of that system at test pressure in
excess of 1/2 psig (3.5 kPa).
Isolate the boiler from the gas supply piping system
by closing its individual service valve during any
pressure testing of the gas supply piping system at
test pressure equal to or less than 1/2 psig (3.5 kPa).
9. Minimum permissible natural gas supply pressure
Inches Water Column (kPa)]:
Minimum permissible LP gas supply pressure is
11.0” w.c. (2.7 kPa).
10. Maximum permissible supply pressure to the boiler
[Inches Water Column (kPa)]:
All models 13.5” (3.4 kPa)
Figure 5.2: Gas Connection to Boiler - Internal
4.5
GM-05
In.
1.1
kPa
4.5
GM-06
In.
1.1
kPa
GM-07
4.6
In.
1.1
kPa
4.9
GM-08
In.
1.2
kPa
Do not subject the gas valve to more than 1/2 psi
pressure (3.5 kPa). Doing so may damage the valve.
⚠
CAUTION
Summary of Contents for Peerless Boilers GM Series
Page 1: ...GM Boilers Series Gas Installation Operation Maintenance Manual...
Page 21: ...19 ELECTRICAL Figure 6 2 Wiring Diagram Spark Ignited Pilot Hydrolevel 3200 Limit control...
Page 25: ...23 Figure 8 3 Operating Instructions Spark Intermittent Ignition START UP PROCEDURES...
Page 26: ...24 START UP PROCEDURES Figure 8 4 Operating Instructions Spark Intermittent Ignition...
Page 38: ...REPAIR PARTS Figure 12 3a Figure 12 3b 36...
Page 40: ...REPAIR PARTS 13 14 15 16 17 24 25 22 21 20 19 18 23 Figure 12 4 38...
Page 42: ...NOTES 40...