28
Chapter 3
Hardware installation
Chapter contents
Planning the installation
........................................................................................................................................29
Installation checklist
........................................................................................................................................30
Site log
............................................................................................................................................................31
Network information
......................................................................................................................................31
Network Diagram
.....................................................................................................................................31
IP related information
.....................................................................................................................................31
Software tools
.................................................................................................................................................32
Power source
...................................................................................................................................................32
Location and mounting requirements
.............................................................................................................32
Installing the VoIP IAD
........................................................................................................................................32
Mounting the VoIP IAD
................................................................................................................................32
Connecting cables
...........................................................................................................................................32
Installing an interface cable on the VoIP IAD’s FXS and FXO interface ports
...........................................33
Installing the Ethernet cable
......................................................................................................................35
Installing the serial WAN cable
.................................................................................................................36
Installing the DSL interface cable
........................................................................................................ 37
Installing the V.35 interface cable
........................................................................................................ 37
Installing the X.21 interface cable
........................................................................................................ 38
Installing the T1/E1 twisted pair cables
............................................................................................... 39
Installing the E1 dual coaxial cables
..................................................................................................... 40
Connecting to external power source
.........................................................................................................41
Summary of Contents for SmartNode 4830 Series
Page 52: ...52 Chapter 5 LEDs status and monitoring Chapter contents Status LEDs 53...
Page 81: ...81 Appendix E SmartNode 4830 Series factory configuration Chapter contents Introduction 82...
Page 83: ...83 Appendix F Installation checklist Chapter contents Introduction 84...
Page 85: ...85 Appendix G Accessories Chapter contents Introduction 86...