![background image](http://html1.mh-extra.com/html/patton-electronics/iplink-2821/iplink-2821_getting-started-manual_4067682055.webp)
Serial port configuration task list
55
IPLink 2800 Series Getting Started Guide
4 • Serial port configuration
2800(frm-rel)[0/0]#pvc 1
2800(pvc)[1]#shutdown
Check the PVC 1 status by using
show running-config
and verify that the entry shutdown occurs in the con-
figuration part responsible for this PVC.
2800(pvc)[1]#show running-config
Running configuration:
#----------------------------------------------------------------#
# #
# 2500 #
…
pvc 1
encapsulation rfc1490
bind interface wan router
shutdown
exit
…
Displaying serial port information
The following example shows the commands used to display serial port configuration settings.
HDLC Driver: 0x8496b8
=====================
Slot: 0
Number of Ports: 1
HDLC Driver: 0x8496b8
=====================
Slot: 0
Number of Ports: 1
Port: serial 0 0 0
------------------
State: OPENED
Configuration
Hardware Port: X.21
Port Type: DCE
CRC: CRC-16
Transmit Edge: Normal
Max Frame Length: 1920
Baudrate: 64000 bps
Recv Threshold: 1
Summary of Contents for IPLink 2821
Page 4: ...Summary Table of Contents IPLink 2800 Series Getting Started Guide 4...
Page 18: ...About this guide IPLink 2800 Series Getting Started Guide 18...
Page 114: ...114 Chapter 9 LEDs status and monitoring Chapter contents Status LEDs 121...
Page 134: ...134 Appendix E IPLink 2800 Series factory configuration Chapter contents Introduction 142...
Page 136: ...136 Appendix F Installation checklist Chapter contents Introduction 144...