Parker LCB Series Mounting Instructions Download Page 16

 

 

Maintenance

 and service

 

Compact Linear Actuator - LCB 

 

16 

192-510014 N06 April 2013

 

In this chapter you can read about: 

Safety Instruction ............................................................................................................. 16 
Maintenance schedule ..................................................................................................... 17 
Check free movement of the sliding carriage ....
............................................................... 17 
Replacement interval for wearing parts ....
........................................................................ 17 
Checking / exchanging / tensioning toothed belt .............................................................. 20 

 
Use only authentic spare parts. 
Improper or unprofessional repair will lead to an expiry of any warranty. 

 

If you encounter problems, please contact:   

Service Dept. 

Phone: +49 (0)781 509-700 

Fax: +49 (0)781 / 509-98316 

 

 

 

3.1 

Safety Instruction 

Before performing any maintenance or repair work, turn the power switch to the '0' 
setting and secure it with a padlock against manipulation. If the unit needs to be 
operable for specific repair works, you have to be especially cautious. Ensure by all 
means that no persons are in the hazardous area. If required, safeguard the 
hazardous area with additional barriers or gratings against unauthorized persons. 
Repair jobs must only be performed by qualified specialists or employees of 
Parker. 
Only qualified expert personnel is permitted to perform works on the linear 
actuator. All the applicable regulations and provisions must be heeded (IEC, EN, 
national accident prevention regulations etc.). 
Qualified persons as the term is used in this manual are persons who: 

 

Persons who, by virtue to their training, experience and instruction, and their 
knowledge of pertinent norms, specifications, accident prevention regulations and 
operational relationships, have been authorized by the person responsible for the 
safety of the system to perform the required task and are capable of recognizing 
potential hazards and avoiding them (definition of technical personnel according 
to VDE015 or IEC364), 

 

Persons who have a knowledge of first-aid techniques and the local emergency 
rescue services. 

 

Persons who have read and will observe the safety instructions. 

 

If set-up, repair or maintenance works require that safety installations be 
dismounted, these must be reinstalled immediately after the respective works 
have been completed. The unit must be shut down before any of the safety 
installations are dismounted. 

 

 

3.  Maintenance and service 

Summary of Contents for LCB Series

Page 1: ...11 16 16 39 192 510014 N06 April 2013 Daten entsprechen dem technischen Stand zum Zeitpunkt der Drucklegung Mounting instructions LCB Manual Installation Commissioning Maintenance and Repair LCB Compa...

Page 2: ...anical Drives Division EME Via Gounod 1 I 20092 Cinisello Balsamo MI Italy Tel 39 0 2 361081 Fax 39 0 2 36108400 E mail sales automation parker com Internet www parker com eme nonwarranty clause We ch...

Page 3: ...otes on transport 9 1 6 Warranty conditions 10 1 7 Conditions of utilization 10 2 Commissioning 11 2 1 Preparations for substructure 11 2 2 Fitting mounting 12 2 2 1 Installation of a single actuator...

Page 4: ...r actuator LCB060 1 2 Type specification plate Type specification plate example Parker Hannifin GmbH Electromechanical Automation Robert Bosch Stra e 22 D 77656 Offenburg Germany Tel 49 0 781 509 0 Id...

Page 5: ...Parker EME Introduction 192 510014 N06 April 2013 5 1 3 Mounting explanation...

Page 6: ...g as well as testing work pieces or tools Since the component can be used in a very wide range of applications the user is responsible for its use in specific applications Please make sure that the mo...

Page 7: ...s must also become familiar with the entire chapter entitled Safety and handling required on the linear actuator Supervisors must ensure that installation and operating personnel have read and underst...

Page 8: ...temperature of 0 C or below Please provide appropriate worker protection e g protective gloves Please ensure that the consignment does correspond to your order Check the product for damages Do never u...

Page 9: ...eing injured Moving parts must always be secured against slipping or moving By wrapping several turns of strong adhesive tape around the sliding carriage which if possible is in the centre of the prof...

Page 10: ...ere is a sufficient safety travel at both ends of the travel stroke Even if the limit switches were already mounted at our premises they must be adapted according to suitable values before operation S...

Page 11: ...re Each holding point must be even with a flat parallelism of 0 2 mm All holding points must be aligned with parallelism to each other of better than 0 5 mm To simplify installation and adjustment the...

Page 12: ...ng crate Place it on the leveled holding points water level leveling device Fix the module LCB mounting methods Fasten the connection parts in place Removing the protective covering adhesive tape Note...

Page 13: ...cond linear actuator if necessary Verify the horizontal alignment of the linear actuators water level leveling device and correct if needs be Fix the second actuator permanently Fasten the connection...

Page 14: ...mounted in proximity of the drive station or the deflection station Switching distance 2 4 mm if needs be an additional external buffer must be fitted Caution The software end limits are not preset F...

Page 15: ...g housing and the coupling mm 23 4 5 40 15 13 5 54 MA Tightening torque of clamping screws Nm 1 4 10 5 AL Distance between flange surface of the coupling housing and the drive station mm 8 14 Details...

Page 16: ...qualified specialists or employees of Parker Only qualified expert personnel is permitted to perform works on the linear actuator All the applicable regulations and provisions must be heeded IEC EN na...

Page 17: ...r joltily please check the following Make a visual inspection of the guiding Check for visual wear and for smoothness of the guiding surface If necessary replace profile If the force needed to move th...

Page 18: ...e plate for measurement Exchange sliding block LCB The sliding block is a wearing part You need 4 pieces per linear actuator 1 Sliding block We recommend to have at least 4 sliding blocks on stock Acc...

Page 19: ...but also the deflection station itself Remove cover in upwards direction Unscrew the two fixing screws at all four sliding blocks entirely and remove sliding blocks Mount new sliding blocks in reverse...

Page 20: ...Splits at the belt teeth Faulty belt pre tension Exchange toothed belt set pre tension Overload Exchange toothed belt set pre tension Check if the load is in the admissible range Aging of the toothed...

Page 21: ...rder to insert the new belt while removing the old one Insert ends of belt cautiously into both clamping brackets On the LCB040 first screw the clamping bracket to the sliding carriage on the side of...

Page 22: ...f the measuring procedure comes with the device 1 toothed belt tensioning screws 2 counter screws The belt is tensioned with the aid of the tensioning screws at the tensioning station loosen lock nut...

Page 23: ...tallation of a double axis actuator 13 Installation of a single actuator 12 Intended use 6 Introduction 4 M Maintenance and service 16 Maintenance schedule 17 Mounting explanation 5 O Ordering the too...

Page 24: ...Compact Linear Actuator LCB 24 192 510014 N06 April 2013...

Reviews: