Parker LCB Series Mounting Instructions Download Page 14

 

 

Commissioning

 

Compact Linear Actuator - LCB 

 

14 

192-510014 N06 April 2013

 

 

The sliding carriages of the two linear actuators must stand on the same position 
P (Recommendation: Push both actuators to the same stop). 

 

Place half-coupling for small shaft diameter on the free shaft ends with distance A 
und tighten clamping screw with torque MA. Insert plastic part. 

 

Slide the two other coupling halves on to the connection shaft. 

 

Position connection shaft between the free shaft ends and push the respective 
coupling halves towards each other. Caution! Do not push to block - coupling 
package must have total length LK. 

 

Tighten clamping screws on both coupling halves on the connection shaft with 
torque MA. 

 

 

Unit

 

LCB040

 

LCB060

 

A   

Distance coupling / drive station 

[mm] 

14 

MA 

Tightening torque of clamping screws 

[Nm] 

1.4 

10.5 

LK 

Length of coupling package 

[mm] 

35 

66 

 

2.2.3. 

Setting the end limits 

The software end limits (programmable end limits) can be used to define the 
maximum travel path in the positive and negative direction. The machine zero 
initiator (home switch) must always be within the software end limits. The switch 
must be mounted so that the sliding carriage can under no circumstances travel 
beyond (the switch should ideally be mounted in proximity of the drive station or the 
deflection station. Switching distance 2 - 4 mm) if needs be an additional external 
buffer must be fitted. 

 

 

Caution 

The software end limits are not preset. For this reason, they must be defined and entered 
into the control system before the unit is placed in service. 

 

 

 

 

 

Note 

Recommendation: The actual zero point of your controller should be the same as the 
machine zero point. 

 

2.2.4. 

Attachment of Motor or Gearbox 

If you ordered the LCB together with a coupling kit, the coupling housing with the 
half-coupling is already mounted on the drive shaft of the linear actuator. In this 
case please proceed with step 2, if not start with step 1. 

(1) If the coupling housing and the half-coupling are not pre-assembled, 
please proceed as follows: 

 

Place half-coupling for small shaft diameter on the drive shaft (with distance AL to 
LCB) and tighten clamping screw with torque MA. 

 

Insert plastic part. 

 

Mount coupling housing 

(2) Coupling housing and half coupling are pre-assembled: 

 

Place the other half-coupling on the gear- or motor shaft and fix with distance AK 
to the flange surface of the drive unit with torque MA.   

 

Fix gearbox and motor to the coupling housing (the gearbox shaft must be exactly 
centered with respect to the drive shaft of the linear actuator! 

 

There should be only an air gap of about 0.5 - 1 mm between the half-coupling on 
the gearbox- or motor shaft and the other half-coupling. 

 

 

Summary of Contents for LCB Series

Page 1: ...11 16 16 39 192 510014 N06 April 2013 Daten entsprechen dem technischen Stand zum Zeitpunkt der Drucklegung Mounting instructions LCB Manual Installation Commissioning Maintenance and Repair LCB Compa...

Page 2: ...anical Drives Division EME Via Gounod 1 I 20092 Cinisello Balsamo MI Italy Tel 39 0 2 361081 Fax 39 0 2 36108400 E mail sales automation parker com Internet www parker com eme nonwarranty clause We ch...

Page 3: ...otes on transport 9 1 6 Warranty conditions 10 1 7 Conditions of utilization 10 2 Commissioning 11 2 1 Preparations for substructure 11 2 2 Fitting mounting 12 2 2 1 Installation of a single actuator...

Page 4: ...r actuator LCB060 1 2 Type specification plate Type specification plate example Parker Hannifin GmbH Electromechanical Automation Robert Bosch Stra e 22 D 77656 Offenburg Germany Tel 49 0 781 509 0 Id...

Page 5: ...Parker EME Introduction 192 510014 N06 April 2013 5 1 3 Mounting explanation...

Page 6: ...g as well as testing work pieces or tools Since the component can be used in a very wide range of applications the user is responsible for its use in specific applications Please make sure that the mo...

Page 7: ...s must also become familiar with the entire chapter entitled Safety and handling required on the linear actuator Supervisors must ensure that installation and operating personnel have read and underst...

Page 8: ...temperature of 0 C or below Please provide appropriate worker protection e g protective gloves Please ensure that the consignment does correspond to your order Check the product for damages Do never u...

Page 9: ...eing injured Moving parts must always be secured against slipping or moving By wrapping several turns of strong adhesive tape around the sliding carriage which if possible is in the centre of the prof...

Page 10: ...ere is a sufficient safety travel at both ends of the travel stroke Even if the limit switches were already mounted at our premises they must be adapted according to suitable values before operation S...

Page 11: ...re Each holding point must be even with a flat parallelism of 0 2 mm All holding points must be aligned with parallelism to each other of better than 0 5 mm To simplify installation and adjustment the...

Page 12: ...ng crate Place it on the leveled holding points water level leveling device Fix the module LCB mounting methods Fasten the connection parts in place Removing the protective covering adhesive tape Note...

Page 13: ...cond linear actuator if necessary Verify the horizontal alignment of the linear actuators water level leveling device and correct if needs be Fix the second actuator permanently Fasten the connection...

Page 14: ...mounted in proximity of the drive station or the deflection station Switching distance 2 4 mm if needs be an additional external buffer must be fitted Caution The software end limits are not preset F...

Page 15: ...g housing and the coupling mm 23 4 5 40 15 13 5 54 MA Tightening torque of clamping screws Nm 1 4 10 5 AL Distance between flange surface of the coupling housing and the drive station mm 8 14 Details...

Page 16: ...qualified specialists or employees of Parker Only qualified expert personnel is permitted to perform works on the linear actuator All the applicable regulations and provisions must be heeded IEC EN na...

Page 17: ...r joltily please check the following Make a visual inspection of the guiding Check for visual wear and for smoothness of the guiding surface If necessary replace profile If the force needed to move th...

Page 18: ...e plate for measurement Exchange sliding block LCB The sliding block is a wearing part You need 4 pieces per linear actuator 1 Sliding block We recommend to have at least 4 sliding blocks on stock Acc...

Page 19: ...but also the deflection station itself Remove cover in upwards direction Unscrew the two fixing screws at all four sliding blocks entirely and remove sliding blocks Mount new sliding blocks in reverse...

Page 20: ...Splits at the belt teeth Faulty belt pre tension Exchange toothed belt set pre tension Overload Exchange toothed belt set pre tension Check if the load is in the admissible range Aging of the toothed...

Page 21: ...rder to insert the new belt while removing the old one Insert ends of belt cautiously into both clamping brackets On the LCB040 first screw the clamping bracket to the sliding carriage on the side of...

Page 22: ...f the measuring procedure comes with the device 1 toothed belt tensioning screws 2 counter screws The belt is tensioned with the aid of the tensioning screws at the tensioning station loosen lock nut...

Page 23: ...tallation of a double axis actuator 13 Installation of a single actuator 12 Intended use 6 Introduction 4 M Maintenance and service 16 Maintenance schedule 17 Mounting explanation 5 O Ordering the too...

Page 24: ...Compact Linear Actuator LCB 24 192 510014 N06 April 2013...

Reviews: