2.2.2.
Installation of a double-axis actuator
Taking the linear actuator out of the shipping crate.
Place it on the leveled holding points (water level, leveling device).
Fix the module (LCB mounting methods)
Place second actuator and fix slightly.
Measuring the parallelism (measure tape).
Measure both diagonals in order to verify rectangularity (measuring tape). Correct
diagonal measure by parallel movement of the second linear actuator, if
necessary.
Verify the horizontal alignment of the linear actuators (water level, leveling
device) and correct if needs be.
Fix the second actuator permanently.
Fasten the connection parts in place.
Removing the protective covering (adhesive tape).
If the sliding carriages of the two linear actuators are to be linked mechanically,
please take care that the system is mounted non distortedly with respect to the
guiding and the drive train. In order to avoid torsional stress, loosen and refasten
the couplings of the shaft kit if needs be.
Alignment of a double-axis actuator
(1) Axis distance
(2) Measure to profile end
Installation of a shaft kit
=
=
(2)
=
=
(1)